Set up

13.1 

Setup before operation 

 
 
 
 
 
 

13.2 Start Time knob setting 

Start motor. In case that Shock Relay does not operate but motor operates, turn knob 
counterclockwise by slow degrees and set to the minimum.   

In case that Shock Relay operates, turn knob clockwise by slow degrees, prolong Start Time 
sequentially until motor operates, and set to the position where Shock Relay does not operate at 
the starting.   

For settings beyond the scale, check operating time with TEST button, 

13.3 Current knob setting 

Turn knob counterclockwise until Shock Relay activates. Turn knob back ( about 20

30%) 

clockwise to set.   

Cautions when operating volume knobs   

When operating volume knobs, please use small screw driver and avoid applying 

excessive pressure. There is rrisk of knob damage.   

  Knob turning angle is 270

.    Please adjust within the range   

of MIN fully left) and MAX (fully right) with moderate pressure.   

There is rrisk of knob damage. 

13.4 Shock Time knob setting 

Set Shock Time knob to the position at which Shock Relay will not trip due to instantaneous 
overload. 

Preferably, set Shock Time to the minimum in accordance with the device property. 

䠍䠐䠊

Troubleshooting 

Trouble 

Check 

Result 

Solution 

Mon does not light 

A1, A2 wiring 

Incorrect wiring 

Wire correctly 

A1, A2 voltage 

Not between 24

240V 

Supply 24

240V 

Does not trip at 
current knob MIN. 

Wiring of CT 

Incorrect wiring 

Wire correctly 

Press and hold TEST 

Does not trip 

Change Shock Relay 

Instantly trip after 
startup.   

Start Time setting 

Set too short 

Set properly 

Current setting 

Set too low 

Set properly 

Trip at instantaneous   
overload. 

Current setting 

Set too low 

Set properly 

Shock Time setting 

Set too short 

Set properly 

Does not trip at 
overload 

Current setting 

Set too high 

Set properly 

Shock Time setting 

Set too long 

Set properly 

Press and hold TEST 

Does not trip 

Change Shock Relay 

        If above contents are not applicable or the replacement of Shock Relay is necessa ry, please contact our sales office. 

䠍䠑䠊

Maintenance 

Maintenance and check must be performed in accordance with the following matters.  

To prevent an accident, keep the surrounding area clean and safe.    

Power off before the installation / connection of Shock Relay 

Comply with the 2-1-1 General Standard of 

Ordinance on Labor Safety and Hygiene 

䠍䠒䠊

Daily check 

MON lamp (green) lights when Shock Relay is power on. 

Set to motor rated current 

Current set knob

 

 

 

3

 

6

 

 

 

Set to the minimum 

Start time set knob

 

 

 

 

Shock time set knob

 

 

Set to 3 seconds 

7

 

 

 

5

 

10 

0.5

 

4

 

5

 

5

 

2

 

 

 

!

 

 

 

!

 

 

Turning angle 270

Содержание TSBSB Series

Страница 1: ...WKLV 6 2 5 3OHDVH PDNH VXUH WKDW WKLV LQVWUXFWLRQ PDQXDO DFFRPSDQLHV WKH 6 2 5 WR WKH HQG XVHU 3OHDVH NHHS WKLV LQVWUXFWLRQ PDQXDO VDIH XQWLO WKLV SURGXFW LV GLVSRVHG RI 3URGXFW VSHFLILFDWLRQ LV VXEM...

Страница 2: ...Shock Relay Instruction Manual Model Identification Following 3 models include main body and external CT TSBSB100 TSBSB05 Main body TSB2CT100 External CT TSBSB200 TSBSB05 Main body TSB2CT200 External...

Страница 3: ...and protective equipment When carrying out operation test or periodic inspection make sure protective device functions properly Megger testing is conditional must be performed in accordance with inst...

Страница 4: ...3 TSBSB05 TSBSB10 TSBSB30 TSBSB60 TSBSB100 TSBSB200 TSBSB300 CT and main unit is wired before shipment Mounting hole dimension Install with 35mmDIN rail or mounting plate Screw Cover Mounting hole...

Страница 5: ...less Insulation Between casing and circuit Over 10M DC500V Megger Dielectric Strength Between casing and circuit AC2000V 60Hz 1min Between contacts AC1000V 60Hz 1min Between circuits and contacts AC2...

Страница 6: ...nstall an isolation transformer Remove terminal cover and use crimp terminal to connect terminal block and wire When connecting without crimp terminal tightening torque of 0 4 0 6N m is recommended to...

Страница 7: ...elect Shock Relay and the number of wires pass through according to set current values Main unit alone AC200VMotor AC400VMotor Capacity kW Motor Rate Current A Shock Relay No of wires that pass throug...

Страница 8: ...hole 15 55 TSBSB100 1 18 5 67 TSBSB100 1 22 78 TSBSB200 1 30 107 TSBSB200 1 54 TSBSB100 1 37 132 TSBSB200 1 66 TSBSB100 1 45 160 TSBSB300 1 80 TSBSB100 1 55 198 TSBSB300 1 99 TSBSB200 1 75 270 TSBSB30...

Страница 9: ...ity of the electromagnetic contactor MC which output contact opens and closes should be less than 200VA when throwing and less than 20VA when holding Part Names SHOCK TIME Shock time setting knob OC O...

Страница 10: ...Shock Relay output mode varies with DIP switch selection Basic Function A Current Operation current value Factory default setting MAX fully rihgt When the motor current exceeds the present CURRENT va...

Страница 11: ...ting Trouble Check Result Solution Mon does not light A1 A2 wiring Incorrect wiring Wire correctly A1 A2 voltage Not between 24 240V Supply 24 240V Does not trip at current knob MIN Wiring of CT Incor...

Страница 12: ...provided in the manual the Seller will repair and replace at no charge once the Goods are returned to the Seller This warranty does not include the following 1 Any costs related to removal of Goods f...

Отзывы: