Fasten the device
Personnel:
Specialist personnel
Protective equipment:
Industrial safety helmet
Safety shoes
Protective gloves
Assemble the device before attaching the plaster-
board bulkhead!
Only work in pairs; preferably use a lift.
DANGER!
Danger of death from the fall of a suspended
unit!
–
Only use fixing materials designed for the
required load.
–
Use all hanging brackets supplied.
–
Stand clear of suspended loads, unless
properly secured.
–
Check secure fixing after installation.
Fig. 5: Dimensions
5 /
1.
Width of heat exchanger B
1
A
320
280
512
427
Fasten the device
Active chilled beams Type DID-E2
8
Содержание DID-E2 Series
Страница 15: ...Active chilled beams Type DID E2 15...
Страница 16: ...Active chilled beams Type DID E2 16...