Connecting the unit – screw connection
Personnel:
Specialist personnel
Protective equipment:
Industrial safety helmet
Safety shoes
Protective gloves
Ensure that the surfaces are clean
1.
Insert seal and tighten screw connection by
hand.
NOTICE!
Incorrect assembly will damage the heat
exchanger!
Always use a suitable tool to counter the tight-
ening force in order to prevent any damage.
2.
Tighten screw connections with a spanner.
NOTICE!
Subzero temperatures will damage the heat
exchanger!
Only fill the heat exchanger if there is no danger
of freezing.
3.
Fill the heat exchanger and vent it. To fill the
system, use clean tap water (pH value 6.5 to
9) or a water glycol mixture (max. 30%
glycol).
4.
Check the system for leaks immediately
after installation and then in regular inter-
vals.
Connecting the ductwork
DID-E2 active chilled beams are fitted with a pri-
mary air spigot.
Fig. 10: DID-E2 duct connection
Spigots are suitable for circular ducts to EN 1506 or
EN 13180.
Connecting the ductwork
Active chilled beams Type DID-E2
11
Содержание DID-E2 Series
Страница 15: ...Active chilled beams Type DID E2 15...
Страница 16: ...Active chilled beams Type DID E2 16...