EN
9
oil heater IDS 20 D / IDS 30 D
Positioning
A number of spatial and technical conditions have to be
considered for the selection of the device's installation site.
Non-observance may impair the proper functioning of the device
or the accessories or can entail risks of personal injury and
property damage.
The following is to be observed for positioning:
•
The device may only be operated on roofed over surfaces.
•
The device is to be set up in a stable position on
incombustible ground.
•
The device must be set up in close proximity to a chimney,
an outer wall or on an open, ventilated surface.
•
The device must be connected to a properly secured mains
power socket.
•
The room where the device is positioned must be
sufficiently ventilated.
Ensure a sufficient fresh air supply, especially when there
are people or animals in the same room with the device!
•
The minimum distance between walls or other objects and
the air outlet opening of the device must be at least 3 m
(see figure).
The minimum distance between walls or other objects and
the air inlet opening of the device must be at least 2 m
(see figure).
There must be no walls or large objects near the device.
•
The inlet and outlet openings must not be covered.
•
There must be a sufficient number of fire extinguishers
available.
25 30
35
40
45
5
10
15
20
2 m
2 m
2 m
2 m
3 m
Start-up
•
Check the scope of delivery of your device for
completeness. If an accessory part is missing, please
contact the Trotec customer service or the specialist dealer
where you purchased the device.
•
Check the device and its connection parts for potential
damage.
•
Observe the conditions described in the chapter
Positioning.
•
Fill the tank with EL fuel oil, kerosene or diesel as
described in chapter Maintenance.
•
Check the device for its proper condition prior to start-up
and at regular intervals during application.
•
Check whether the characteristics of the power grid
conform to those on the nameplate.
•
Each time before you plug the mains plug into the mains
socket and switch on the device, make sure that the fan is
moving freely.
•
Connect the power cable to a properly secured socket.
On construction sites, there must be a residual current
device (RCD) installed upstream of the socket in
accordance with national regulations (in Germany:
VDE 0100/0105).
The device is now ready for operation.