EN
7
Fog and flue gas simulator FS 200
Connecting the canister
A.
B.
Switching the device on
8
9
10
11
12
13
14
15
1
1. Check the canister's filling level and exchange it, if
required (see the "Exchanging the canister" chapter).
2. Unscrew the sealing cap on the canister by a half-turn to
avoid the creation of a vacuum.
3. Plug the power cable into a sufficiently fused socket.
4. Press the on/off switch (8).
ð
The switch lights up in green.
5. Set the pump controller (14) to
8 o'clock
position.
ð
The
heating-up phase
(9) indicator lights up in red.
ð
The heating-up phase of the device starts.
6. Wait for approx. 7 minutes until the heating-up phase is
completed.
ð
The
heating ready
(10) indicator is illuminated in green,
showing that the device is ready for operation.
7. Use the pump controller (14) to adjust the desired amount
of fog.
ð
Fog starts being emerging from a position of approx.
9
o'clock
and the
pump
(11) indicator is illuminated in
blue.
8. Gradually rotate the pump controller (14) clockwise until
fog is conveyed constantly (roughly
12 o'clock
position).
9. Use the turbine controller (13) to adjust the air volume as
desired.
Info
Keep in mind that the density of the fog depends on
both the set pump capacity and the turbine
performance.
Info
If fog emerges from the ventilation grilles of the device,
the counter-pressure at the outlet nozzle of the device
is too high and the turbine power is set too low! This
causes the formation of condensate in the housing
interior.
Operation with flue gas chamber and smoke cartridges
Wear protective gloves
Always wear protective gloves when working with the
device, especially when using the flue gas chamber!
Wear a protective mask
When working with the device in closed rooms and
when using the flue gas chamber always wear
respiratory protection!
Fire simulations as for fire brigade training exercises or the
tightness test of certain measurement environments (e. g.
ducts) often demand the application of coloured smoke. For
these applications please use the TROTEC
®
flue gas chamber
combined with the coloured TROTEC
®
smoke cartridges.
Info
If the coloured smoke is later to be mixed with the fog
generated by the FS 200, the heating must be
preheated and ready for operation.