6
TG500
HARDWARE & TOOLS LIST
INSTRUCTIONS FOR ASSEMbLy
•
Before you start to assemble, please check the hardware packaging to make sure all parts are included.
•
Basic tools, such as spanners will be provided for assembly.
#1 L/R 1/2” 2 PCS
#4 d17 2 PCS
#3 S14 2 PCS
#6 1/ 2” 2 PCS
#7 L/R 1/2” 2 PCS
#11 M8 4 PCS
#9 M8*62 4 PCS
#12 d8 x 5 16 x 1. 5 x R25 4 PCS
#20 M10 x 45 4 PCS
#13 M10 4 PCS
#74 S13 S17 S19 1 PC
1: x 32 d10 2 PCS
#31 M10 x 18 2 PCS
#33 2 PCS
#72 S6 2 PCS
#38 1 PC
#73 S8 1 PC
#34 M8 x 35 2 PCS
#55 d16 x 5 18 x 1 2 PCS
Содержание Glide Cycle 500
Страница 23: ...23 TG500 notes ...
Страница 24: ...24 TG500 notes ...