COM MISSIONING
The first operation of the shower is intended to
flush out any remaining unit debris, and to
ensure the heater unit contains water before the
elements are switched on. This operation must
be carried out with the flexible hose screwed to
the outlet but
without
the sprayhead attached.
The ‘COLD’ position must be used. Ensure the
outlet of the flexible hose is directed to waste.
NOTE: Ensure the ‘START/STOP’ button is not
depressed in the cover which indicates ‘start’.
The button should be flush with the cover,
otherwise water will flow as soon as the
electricity is switched on.
Before turning on the electric and mains water
supplies to the shower, ensure that the power
selector is at the 'COLD' position (fig.30) and the
temperature control is rotated fully clockwise to
‘10’, the minimum flow position (fig.31).
NOTE: Failure to turn the control to ‘10’ may
cause the PRD to operate.
Turn on the mains water supply to the shower at
the isolating stop valve and then turn on the
electric supply to the shower at the isolating
switch. The power indicator will light.
Press the ‘START/STOP’ button (fig.32) and
wait until water starts to flow from the
flexible hose.
Slowly rotate the temperature control fully anti-
clockwise to ‘1’, the maximum flow position
(fig.33).
It will take approximately 30 seconds for a
smooth flow of water to be obtained whilst air
and debris is being dispersed from the shower.
When a smooth flow of water is obtained, rotate
the temperature control from ‘1’ to ‘10’ several
times to release any trapped air within the unit.
Once flushing out has been completed, stop the
water flow by pressing the ‘START/STOP’ button.
Fit the sprayhead to the flexible hose and place
in the sprayhead holder. The shower is now
ready for normal operation.
1
2
3
4
5
6
7
8
9
10
1
2
3
4
5
6
7
8
9
10
Fig.30
Fig.31
Fig.33
Fig.32
Содержание Topaz T80si
Страница 23: ...T80si ...