background image

Triton Showers

Triton Road

Nuneaton

Warwickshire  CV11 4NR

Triton is a division of Norcros Group (Holdings) Limited

TriTon STandard GuaranTee

Triton guarantee this product against all 

mechanical and electrical defects arising from faulty 

workmanship or materials for a period of one year 

for domestic use only, from the date of purchase, 

provided that it has been installed by a competent 

person in full accordance with the 
fitting instructions.
Any part found to be defective during this 

guarantee period we undertake to repair or replace 

at our option without charge so long as it has been 

properly maintained and operated in accordance 

with the operating instructions, and has not been 

subject to misuse or damage.
This product must not be taken apart, modified or 

repaired except by a person authorised by Triton. 

This guarantee applies only to products installed 

within the United Kingdom and does not apply to 

products used commercially. This guarantee does 

not affect your statutory rights.

What is not covered:

1

Breakdown due to: 

a)

 use other than domestic 

use by you or your resident family; 

b)

 wilful act or neglect; 

c)

 any malfunction 

resulting from the incorrect use or quality of 

electricity, gas or water or incorrect setting of 

controls;

d)

 faulty installation.

2

Repair costs for damage caused by foreign 

objects or substances.

3

Total loss of the product due to non-availability 

of parts.

4

Compensation for loss of use of the product or 

consequential loss of any kind.

5

Call out charges where no fault has been found 

with the appliance.

6

The cost of repair or replacement of pressure relief 

devices, showerheads, hoses, riser rails and/or wall 

brackets, isolating switches, electrical cable, fuses 

and/or circuit breakers or any other accessories 

installed at the same time.

7

The cost of routine maintenance, adjustments, 

overhaul modifications or loss or damage arising 

therefrom, including the cost of repairing 

damage, breakdown, malfunction caused by 

corrosion, furring, pipe scaling, limescale, system 

debris or frost.

Customer Service: 

0844 980 0750

Trade installer Hotline: 

0844 980 0730

Fax:

 

0844 980 0744

www.tritonshowers.co.uk 

e-mail: [email protected]

TRITON reserve the right to change product specification without prior notice. E&OA. © TRITON SHOWERS 2009

Service Policy

In the event of a product fault or complaint occurring, the 

following procedure should be followed:

1

Telephone Customer Service on 0844 980 0750 having available, 

your details including post code, the model number and power 

rating of the product, together with the date of purchase.

2

Based on information given over the telephone, a Triton Customer 

Service Advisor will attempt to diagnose the fault and confirm 

whether a site visit from a qualified service engineer is required.

3

All products attended to by a Triton service engineer must be 

installed in full accordance with the Triton installation guide 

applicable to the product. (Every product pack contains an 

installation guide, however, they can also be bought via our 

Customer Service Spares Department).

4

Our engineer will require local parking and if a permit is required 

this must be available to the engineer on arrival at the call. 

5

It is essential that you or an appointed representative (who must 

be over 18 years of age) is present for the duration of the service 

engineer's visit. If the product is in guarantee you must produce 

proof of purchase.

6

Where a call under the terms of guarantee has been booked 

and the failure is not product related (i.e. scaling and furring, 

incorrect water pressure, pressure relief device operation or 

electrical/plumbing installation fault) a charge will be made. A 

charge will also be issued if nobody is at home when the service 

engineer calls or adequate parking/permit is not available.

7

If the product is no longer covered by the guarantee an up front 

fixed fee will be charged before the site visit.

8

Should proof of purchase not be available on an “in-guarantee” 

call, or should the service engineer find that the product is no 

longer under guarantee, the engineer will charge the same 

fixed price and the customer will be expected to pay the 

engineer before he leaves. If payment is not made on the day an 

administration charge will be added to the fixed charge.

9

If a debt is outstanding from a previous visit, or from any other 

Triton purchase, Triton reserves the right to withhold service until 

the debt has been settled.

10

Triton takes the health, safety and wellbeing of its employees very 

seriously and expects customers to treat all staff members with 

respect. Should any employee feel threatened or receive abuse, 

either verbally or physically, Triton reserves the right to withhold 

service and will support the employee with a legal prosecution.

replacement Parts Policy

Availability: It is the policy of the manufacturer to maintain parts 

availability for the duration of production and a period of five years 

thereafter, in accordance with industry standards.

Spare parts are available via our website, 

www.tritonshowers.co.uk

,

or by telephoning Triton Customer Service Spares Department.  

Payment should be made by credit/debit card (excluding American 

Express or Diners Card).

Payment can also be made by pre-payment of a pro forma invoice by cheque or money order.

Extended Warranty AVAILABLE NOW. Call 0844 980 0740 for more details.

Содержание T90xr

Страница 1: ...note these instructions are to be left with the user T90xr pumped electric shower IMPORTANT Under NO circumstances must this shower be connected directly to a mains water supply It is designed for GRAVITY FED COLD WATER systems ONLY Failure to comply may invalidate product warranty ...

Страница 2: ...nections 12 Commissioning 13 Operating the shower 16 Operating functions 18 Instructions for installers and service engineers only 19 Spare parts 20 Fault finding 21 22 Guarantee service policy etc rear cover CONTENTS Page CONTENTS Page To check the product suitability for commercial and multiple installations please contact Triton s specification advisory service before installation Telephone Fac...

Страница 3: ...res and could also cause the Pressure Relief Device in the unit to operate This product is not suitable for mounting into steam rooms or steam cubicles PLUMBING The plumbing installation must comply with Water Regulations Building Regulations or any particular regulations as specified by Local Water Company or Water Undertakers and should be in accordance with BS 6700 The supply pipe must be flush...

Страница 4: ...e which in effect slows the water flow c If for any reason there is a sudden rise in water temperature the unit has thermal cut out devices built in see items 3 and 4 under Fault Finding d Switch off immediately at the isolating switch if water ceases to flow Press the Start Stop button and contact Customer Service for advice If ever the water becomes too hot and you cannot obtain cooler water fir...

Страница 5: ...et 18 Outlet pipe 19 Trimplate Other items Screw fixing kit Instructions guarantee etc Main components MAIN COMPONENTS 268 mm 330 mm 157 mm 49 mm 58 mm Note Not all wiring shown for reasons of clarity Inside unit fig 1 I 001 A IMPORTANT When first installed the unit will be empty It is essential the unit should contain water before the elements are switched on It is vital that the commissioning pr...

Страница 6: ...se way which will take the fuse or Miniature Circuit Breaker MCB necessary for the shower Fig 4 4 1 If your consumer unit has a rating below 80A or if there is no spare fuse way then the installation will not be straightforward and may require a new consumer unit serving the house or just the shower 4 2 You will need to contact the local electricity company They will check the supply and carry out...

Страница 7: ...D 8 The current carrying capacity of the cable must be at least that of the shower circuit protection see Table B 8 1 To obtain full advantage of the power provided by the shower use the shortest cable route possible from the consumer unit to the shower 8 2 It is also necessary to satisfy the disconnection time and thermal constraints which means that for any given combination of current demand vo...

Страница 8: ...gallons There must be a maximum head of water of 10 metres and a minimum head of 8 cm as measured between the bottom of the cistern and the top of the shower unit There must be no other cold water draw offs between the cistern and the unit and the pipe must not supply water to any other tap or fitting at a lower level Note The supply pipe from the cistern should be on the opposite side to the floa...

Страница 9: ...ray or other fixed appliance The use of the supplied soap dish will in most cases meet this requirement but if the showerhead can be placed within a bath basin or shower tray then a double check valve or similar must be fitted in the supply pipework to prevent back flow Allow enough room between the ceiling and the shower to access the cover top screws Pressure relief safety device A pressure reli...

Страница 10: ...se then remove the cover Remove the two screws holding the outlet pipe to the base of the can Carefully pull away from the can and then unscrew the two screws holding the PRD to the outlet pipe Caution Do not attempt to replace the PRD unless competent to do so Note Before replacing the cover it is strongly advised to prime the unit see commissioning Fig 7 ...

Страница 11: ...backplate If a top entry is required for the water pipe then remove the top insert from the backplate fig 8 If a bottom entry is required for the cold water pipe then a hole will need to be cut out of the trimplate fig 9 If entry is from the back the nut of the compression fitting will be partially behind the surface of the wall fig 10 This area must be left clear when plastering over the pipework...

Страница 12: ...s and an appropriate drill bit Screw the two upper fixing screws into position leaving the base of the screw heads protruding 6 mm out from the wall Hook the backplate over the top screws and fit the lower fixing screw into position Do not fully tighten the screws at this stage as the fixing holes are elongated to allow for out of square adjustment after the plumbing connections have been complete...

Страница 13: ... draw offs between the shower and the cistern Important Before completing the connection of the water supply to the inlet of the shower flush out the pipework to remove all swarf and system debris This can be achieved by connecting a hose to the pipework and turning on the water supply long enough to clear the debris to waste Connect the water supply to the inlet of the shower via 15 mm copper sta...

Страница 14: ...tor must be sleeved The outer sheath of the supply cable must be stripped back to the minimum The supply cable must be secured either by routing through conduit or in trunking or by embedding in the wall in accordance with current IEE regulations The use of connections within the unit or other points in the shower circuit to supply power to other equipment i e extractor fans pumps etc will invalid...

Страница 15: ...s 1 fig 14 Position the power selector to the cold position fig 15 do not remove the locking screw fitted to the power selector spindle fig 16 it can be removed only when the commissioning procedure has been completed Make sure the water supply is still turned on to the shower Open the bleed screw on the pump unit fig 17 by rotating one revolution When water flows from the opening this indicates t...

Страница 16: ...recheck the points above Secure the cover temporarily in position with two retaining screws DO NOT OVERTIGHTEN Switch on the mains electric supply to the shower at the isolating switch Press the Start Stop button fig 20 The power indicator will light and the pump starts to operate It will take about thirty seconds for a smooth flow of water to be obtained while air and any debris is being flushed ...

Страница 17: ...ws Important Take care to ensure that the four screws securing the cover are fully tightened failure to do so may affect compliance with the IPX4 test DO NOT OVERTIGHTEN Switch the mains electric supply back on to the shower at the isolating switch Once the showerhead and riser rail are fitted the shower is ready for normal use ...

Страница 18: ...s energy during warmer months and any temperature adjustment at this setting is via the temperature control The red symbol is the high power setting which allows the highest flow achievable for your preferred temperature Temperature adjustment at this setting is via the temperature control W 003 A WARNING If restarting immediately after stopping be aware that a slug of hot water will be expelled f...

Страница 19: ...fore stepping under the showerhead There will always be a time delay of a few seconds between selecting a flow rate and the water reaching the stable temperature for that flow rate Caution It is recommended that persons who may have difficulty understanding or operating the shower controls should not be left unattended while showering Special consideration should be given to young children and the...

Страница 20: ...he elements will be automatically restored to the setting at the time of interruption Safety cut out The unit is fitted with a non resettable over temperature safety device In the event of abnormal operation which could cause unsafe temperatures within the unit the device will disconnect the heating elements It will require a visit from a qualified engineer to determine the nature of the fault and...

Страница 21: ...on the filter shut off valve when carrying out repairs or service to other areas of the shower unit Unscrew the filter fig 24 by turning anti clockwise Remove the unit complete with the filter and wash under running water Make sure all debris is removed Replace by pushing the unit back into its housing until the threads engage and then turn fully clockwise until tight DO NOT OVERTIGHTEN Before rep...

Страница 22: ...l cut out 22010070 Pump and motor assembly P15211002 Start Stop switch assembly 82300510 Outlet pipe Terminal block assembly S15210904 Filter assembly P15210802 Flow valve assembly P15210800 Trimplate 7053603 Cover assembly including Start Stop switch assembly P15210600 Pressure relief device PRD 82800450 Heater can assembly 8 5kW P15210701 9 5kW P15210702 Solenoid 22009120 Terminal block 22011410...

Страница 23: ... competent electrician 1 2 1 Remove the cover and make sure the plug and socket are firmly connected 1 3 1 Have solenoid checked by a competent electrician or contact Customer Service 1 4 1 If the power neon is lit when the Start Stop button is pressed have the pump checked by a competent person or contact Customer Service 2 1 1 Increase flow rate via temperature control 2 1 2 Blocked showerhead c...

Страница 24: ...t blocked First isolate the electricity supply and then remove the cover 6 1 2 Check the cold water cistern is full 6 1 3 Make sure the water supply pipe is not blocked or air locked 6 1 4 Check there is no simultaneous demand from the cistern during showering 6 1 5 Reprime the unit without electricity switched on to the unit see commissioning 7 1 1 Clean or replace blocked showerhead and then fit...

Страница 25: ...23 T90xr pumped electric shower ...

Страница 26: ...24 T90xr pumped electric shower ...

Страница 27: ...25 T90xr pumped electric shower ...

Страница 28: ...purchase 2 Based on information given over the telephone a Triton Customer Service Advisor will attempt to diagnose the fault and confirm whether a site visit from a qualified service engineer is required 3 All products attended to by a Triton service engineer must be installed in full accordance with the Triton installation guide applicable to the product Every product pack contains an installati...

Страница 29: ...Pdf Supplied By http www plumbworld co uk ...

Отзывы: