background image

T90xr pumped electric shower



Products manufactured by Triton are safe and without risk provided they are installed, used and 

maintained in good working order in accordance with our instructions and recommendations.

WARNING: DO NOT

 operate shower if frozen, or suspected of being frozen. It must thaw out 

before using.

DO NOT

 operate the unit if the showerhead or spray hose becomes damaged.

DO NOT

 restrict flow out of shower by placing showerhead in direct contact with your body.

DO NOT

 operate the shower if water ceases to flow during use or if water has entered inside 

the unit because of an incorrectly fitted cover.

WARNING:

If restarting the shower immediately after stopping, be aware that a slug of 

hot water will be expelled for the first few seconds.

PLEASE READ THIS IMPORTANT SAFETY INFORMATION

A-001-A

1
1.1

1.2

1.3

1.4

1.5

1.6

a)

b)

c)
1.7

1.8

1.9

2
2.1

2.2

2.3

2.4

2.5

2.6

3
3.1

3.2
3.3

3.4

GENERAL

Isolate the electrical and water supplies before 

removing the cover.
Read all of these instructions and retain them 

for later use.
DO NOT take risks with plumbing or electrical 

equipment.
Isolate electrical and water supplies before 

proceeding with the installation.
The unit must be mounted onto the finished 

wall surface (on top of the tiles). Do not tile up 

to unit after fixing to wall.
Contact Customer Service 

(see back page)

, if 

any of the following occur:
If it is intended to operate the shower at 

pressures above the maximum or below the 

minimum stated.
If the unit shows a distinct change in 

performance.
If the shower is frozen.
If it is intended to operate the shower in areas 

of hard water (above 200 ppm temporary 

hardness), a scale inhibitor may have to be 

fitted. For advice on the Triton Scale Inhibitor, 

contact Triton Customer Service.
The showerhead must be cleaned regularly 

with descalent to remove scale and debris, 

otherwise restrictions to the flow on the outlet 

of the unit will result in higher temperatures 

and could also cause the Pressure Relief Device 

in the unit to operate.
This product is not suitable for mounting into 

steam rooms or steam cubicles.

PLUMBING

The plumbing installation must comply with 

Water Regulations, Building Regulations or any 

particular regulations as specified by Local 

Water Company or Water Undertakers and 

should be in accordance with BS 6700.
The supply pipe must be flushed to clear 

debris before connecting to the shower unit.
DO NOT solder pipes or fittings within 

300mm of the shower unit, as heat can 

transfer along the pipework and damage 

components.
DO NOT fit any form of outlet flow control as 

the outlet acts as a vent for the heater can.
DO NOT use excessive force when making 

connections to the flexible hose or 

showerhead, finger tight is sufficient.
All plumbing connections must be completed 

before making the electrical connections.

ELECTRICAL

The installation must comply with BS 7671 

‘Requirements for electrical installations’ (IEE 

wiring regulations), building regulations or any 

particular regulations as specified by the local 

Electrical Supply Company.
This appliance MUST be earthed.
In accordance with ‘The Plugs and Sockets etc. 

(Safety) Regulations 1994’, this appliance is 

intended to be permanently connected to the 

fixed wiring of the electrical mains system.
Make sure all electrical connections are tight 

to prevent overheating.
Fuses do not give personal protection against 

electric shock.

A 30mA residual current device (RCD) MUST 

be installed in all UK electric and pumped 

shower circuits. This may be part of the 

consumer unit or a separate unit.
Switch off immediately at isolating switch if 

water ceases to flow during use.
Other electrical equipment i.e. extractor fans, 

pumps must not be connected to the circuits 

within the unit.

Switch off at isolating switch when not in use. 

This is a safety procedure recommended with 

all electrical appliances.

As with all electrical appliances it is 

recommended to have the shower and 

installation checked at least every two years by 

a competent electrician to ensure there is no 

deterioration due to age and usage.

3.5

3.6

3.7

3.8

3.9

3.10

Содержание T90xr

Страница 1: ...note these instructions are to be left with the user T90xr pumped electric shower IMPORTANT Under NO circumstances must this shower be connected directly to a mains water supply It is designed for GRAVITY FED COLD WATER systems ONLY Failure to comply may invalidate product warranty ...

Страница 2: ...nections 12 Commissioning 13 Operating the shower 16 Operating functions 18 Instructions for installers and service engineers only 19 Spare parts 20 Fault finding 21 22 Guarantee service policy etc rear cover CONTENTS Page CONTENTS Page To check the product suitability for commercial and multiple installations please contact Triton s specification advisory service before installation Telephone Fac...

Страница 3: ...res and could also cause the Pressure Relief Device in the unit to operate This product is not suitable for mounting into steam rooms or steam cubicles PLUMBING The plumbing installation must comply with Water Regulations Building Regulations or any particular regulations as specified by Local Water Company or Water Undertakers and should be in accordance with BS 6700 The supply pipe must be flush...

Страница 4: ...e which in effect slows the water flow c If for any reason there is a sudden rise in water temperature the unit has thermal cut out devices built in see items 3 and 4 under Fault Finding d Switch off immediately at the isolating switch if water ceases to flow Press the Start Stop button and contact Customer Service for advice If ever the water becomes too hot and you cannot obtain cooler water fir...

Страница 5: ...et 18 Outlet pipe 19 Trimplate Other items Screw fixing kit Instructions guarantee etc Main components MAIN COMPONENTS 268 mm 330 mm 157 mm 49 mm 58 mm Note Not all wiring shown for reasons of clarity Inside unit fig 1 I 001 A IMPORTANT When first installed the unit will be empty It is essential the unit should contain water before the elements are switched on It is vital that the commissioning pr...

Страница 6: ...se way which will take the fuse or Miniature Circuit Breaker MCB necessary for the shower Fig 4 4 1 If your consumer unit has a rating below 80A or if there is no spare fuse way then the installation will not be straightforward and may require a new consumer unit serving the house or just the shower 4 2 You will need to contact the local electricity company They will check the supply and carry out...

Страница 7: ...D 8 The current carrying capacity of the cable must be at least that of the shower circuit protection see Table B 8 1 To obtain full advantage of the power provided by the shower use the shortest cable route possible from the consumer unit to the shower 8 2 It is also necessary to satisfy the disconnection time and thermal constraints which means that for any given combination of current demand vo...

Страница 8: ...gallons There must be a maximum head of water of 10 metres and a minimum head of 8 cm as measured between the bottom of the cistern and the top of the shower unit There must be no other cold water draw offs between the cistern and the unit and the pipe must not supply water to any other tap or fitting at a lower level Note The supply pipe from the cistern should be on the opposite side to the floa...

Страница 9: ...ray or other fixed appliance The use of the supplied soap dish will in most cases meet this requirement but if the showerhead can be placed within a bath basin or shower tray then a double check valve or similar must be fitted in the supply pipework to prevent back flow Allow enough room between the ceiling and the shower to access the cover top screws Pressure relief safety device A pressure reli...

Страница 10: ...se then remove the cover Remove the two screws holding the outlet pipe to the base of the can Carefully pull away from the can and then unscrew the two screws holding the PRD to the outlet pipe Caution Do not attempt to replace the PRD unless competent to do so Note Before replacing the cover it is strongly advised to prime the unit see commissioning Fig 7 ...

Страница 11: ...backplate If a top entry is required for the water pipe then remove the top insert from the backplate fig 8 If a bottom entry is required for the cold water pipe then a hole will need to be cut out of the trimplate fig 9 If entry is from the back the nut of the compression fitting will be partially behind the surface of the wall fig 10 This area must be left clear when plastering over the pipework...

Страница 12: ...s and an appropriate drill bit Screw the two upper fixing screws into position leaving the base of the screw heads protruding 6 mm out from the wall Hook the backplate over the top screws and fit the lower fixing screw into position Do not fully tighten the screws at this stage as the fixing holes are elongated to allow for out of square adjustment after the plumbing connections have been complete...

Страница 13: ... draw offs between the shower and the cistern Important Before completing the connection of the water supply to the inlet of the shower flush out the pipework to remove all swarf and system debris This can be achieved by connecting a hose to the pipework and turning on the water supply long enough to clear the debris to waste Connect the water supply to the inlet of the shower via 15 mm copper sta...

Страница 14: ...tor must be sleeved The outer sheath of the supply cable must be stripped back to the minimum The supply cable must be secured either by routing through conduit or in trunking or by embedding in the wall in accordance with current IEE regulations The use of connections within the unit or other points in the shower circuit to supply power to other equipment i e extractor fans pumps etc will invalid...

Страница 15: ...s 1 fig 14 Position the power selector to the cold position fig 15 do not remove the locking screw fitted to the power selector spindle fig 16 it can be removed only when the commissioning procedure has been completed Make sure the water supply is still turned on to the shower Open the bleed screw on the pump unit fig 17 by rotating one revolution When water flows from the opening this indicates t...

Страница 16: ...recheck the points above Secure the cover temporarily in position with two retaining screws DO NOT OVERTIGHTEN Switch on the mains electric supply to the shower at the isolating switch Press the Start Stop button fig 20 The power indicator will light and the pump starts to operate It will take about thirty seconds for a smooth flow of water to be obtained while air and any debris is being flushed ...

Страница 17: ...ws Important Take care to ensure that the four screws securing the cover are fully tightened failure to do so may affect compliance with the IPX4 test DO NOT OVERTIGHTEN Switch the mains electric supply back on to the shower at the isolating switch Once the showerhead and riser rail are fitted the shower is ready for normal use ...

Страница 18: ...s energy during warmer months and any temperature adjustment at this setting is via the temperature control The red symbol is the high power setting which allows the highest flow achievable for your preferred temperature Temperature adjustment at this setting is via the temperature control W 003 A WARNING If restarting immediately after stopping be aware that a slug of hot water will be expelled f...

Страница 19: ...fore stepping under the showerhead There will always be a time delay of a few seconds between selecting a flow rate and the water reaching the stable temperature for that flow rate Caution It is recommended that persons who may have difficulty understanding or operating the shower controls should not be left unattended while showering Special consideration should be given to young children and the...

Страница 20: ...he elements will be automatically restored to the setting at the time of interruption Safety cut out The unit is fitted with a non resettable over temperature safety device In the event of abnormal operation which could cause unsafe temperatures within the unit the device will disconnect the heating elements It will require a visit from a qualified engineer to determine the nature of the fault and...

Страница 21: ...on the filter shut off valve when carrying out repairs or service to other areas of the shower unit Unscrew the filter fig 24 by turning anti clockwise Remove the unit complete with the filter and wash under running water Make sure all debris is removed Replace by pushing the unit back into its housing until the threads engage and then turn fully clockwise until tight DO NOT OVERTIGHTEN Before rep...

Страница 22: ...l cut out 22010070 Pump and motor assembly P15211002 Start Stop switch assembly 82300510 Outlet pipe Terminal block assembly S15210904 Filter assembly P15210802 Flow valve assembly P15210800 Trimplate 7053603 Cover assembly including Start Stop switch assembly P15210600 Pressure relief device PRD 82800450 Heater can assembly 8 5kW P15210701 9 5kW P15210702 Solenoid 22009120 Terminal block 22011410...

Страница 23: ... competent electrician 1 2 1 Remove the cover and make sure the plug and socket are firmly connected 1 3 1 Have solenoid checked by a competent electrician or contact Customer Service 1 4 1 If the power neon is lit when the Start Stop button is pressed have the pump checked by a competent person or contact Customer Service 2 1 1 Increase flow rate via temperature control 2 1 2 Blocked showerhead c...

Страница 24: ...t blocked First isolate the electricity supply and then remove the cover 6 1 2 Check the cold water cistern is full 6 1 3 Make sure the water supply pipe is not blocked or air locked 6 1 4 Check there is no simultaneous demand from the cistern during showering 6 1 5 Reprime the unit without electricity switched on to the unit see commissioning 7 1 1 Clean or replace blocked showerhead and then fit...

Страница 25: ...23 T90xr pumped electric shower ...

Страница 26: ...24 T90xr pumped electric shower ...

Страница 27: ...25 T90xr pumped electric shower ...

Страница 28: ...purchase 2 Based on information given over the telephone a Triton Customer Service Advisor will attempt to diagnose the fault and confirm whether a site visit from a qualified service engineer is required 3 All products attended to by a Triton service engineer must be installed in full accordance with the Triton installation guide applicable to the product Every product pack contains an installati...

Страница 29: ...Pdf Supplied By http www plumbworld co uk ...

Отзывы: