![Triton Luxury Body Dryer Скачать руководство пользователя страница 11](http://html1.mh-extra.com/html/triton/luxury-body-dryer/luxury-body-dryer_installation-and-operating-instructions-manual_1169158011.webp)
Body dryer
8
20mm
diameter
FITTING OF THE DRYER
Before installation check the parts for any signs
of obvious damage.
Read, understand and follow the installation
safety guidelines that come with this product.
The dryer has been designed for use in a
bathroom or shower room for the purpose of
personal body drying. The dryer should NOT be
used for any other purpose; see
'Siting'
.
Parts check list
Hand-held controller and battery (3V Lithium
12032)
Main unit
Ceiling cover
Template
Support straps and staples
Ceiling fittings
Tools required
Electrical test meters
Small bradawl/small screwdriver
Marker pen/pencil and straight edge
Pad saw
Crosshead screwdriver
Flat head screwdriver
Hand-held drill with 8mm drill bit
Protective goggles/glasses and face mask
Procedure
Use the template and cover to determine
the best position for the body dryer. Careful
observation and measurement both above and
below the ceiling will ensure all factors are taken
into account before any marking, drilling or
cutting, takes place.
If the template does not fit easily between the
roof joists then a section of joist may have to be
removed and the remainder supported by cross
members attached to the adjacent joists with
suitable supports on either side of the unit.
IMPORTANT:
This task is beyond the scope
of this book and should NOT be attempted
unless the installer is suitably experienced
and has the knowledge and skills to maintain
a secure structure.
The minimum distance between joists is 355mm.
Fig.8
Fig.9
Fig.10