Veefil-RT 175-S Site Installation Manual
TRI125.INS.018 version 1
4 March 2020
Manual
Page 13 of 25
Figure 6: IPU Cable Entry Diagram
After the foundation is prepared:
Ensure that all cables are pulled and labelled correctly according to the cabling plan.
Note:
For more information, see TRI125.INS.016 Veefil-RT 175-S Piping and Cabling.
Cut the mounting rods down to 50mm above the foundation ground.
Deburr, then straighten threads.
Clean the slab of dust and debris.
Apply anti-seize to rods and temporarily fasten with an M12 Nut and flat washer.