Veefil-RT 175-S Site Installation Manual
TRI125.INS.018 version 1
4 March 2020
Manual
Page 19 of 25
4.7
User unit installation
4.7.1
Foundation preparation
Note:
If the user unit is to be located a distance greater than 100m from the IPU, optical fibre
is required for communication in place of Cat6a.
Foundation design and preparation is the responsibility of the customer. Device footprints
are provided by tritium for hole drilling and conduit / cable location guidance. For further
details, please refer to
TRI125.INS.001 Veefil-RT175-S User Unit Installation Manual.
Note:
A mounting stencil may be supplied by tritium at customer request.
Figure 14: User Unit Baseplate Dimensions
Ensure that all cables are pulled and labelled correctly.
Ensure that conduits are cut to 70mm from the foundation ground.
Cut the M16 mounting rods down to 50mm from the foundation ground.
Note:
Do not use less than M12.
Clean the foundation of any debris.
Inspect the mounting rods to ensure they are straight, and the threads are clean.