6
5. Installation
3
Front Panel Installation
Insert the Front Panel hooks into the rectangular cutouts in the
Side Panels. All hooks must be engaged for proper assembly.
Apply downward pressure to properly seat the panel. Secure the
Front Panel using (2) #6-32 Locking Screws.
Before installing the first piece of equipment,
make sure to temporarily install the Front Panel.
This allows uniform spacing of the Side Panels,
squares and aligns the cabinet, and ensures
proper seating of the locking cover. After the
first piece of equipment is securely installed,
the Front Panel and Vent Tray can once again be
removed to install any remaining equipment.
4
Equipment Installation
With user-supplied standard rack hardware (#12-24 screws),
vertically mount up to 8U (SRWF12U38) or 12U (SRWF16U38)
of network equipment
A
, and up to 4U of patch panels
horizontally
B
.
5
Cover Installation
Place cover onto the Side Panels and slide toward the
Backplate. When properly seated, the cover should be flush
against the Backplate and level with the top of the Backplate.
The cover may then be locked with either of the two (2) keys
provided.
A
B
16-04-227-9335C5.indb 6
9/2/2016 10:19:06 AM
Содержание SRWF12U38
Страница 27: ...27 4 4 1 1 2 3 4 Tripp Lite 4 2 1 2 3 2 6 32 4 5 4 16 04 227 9335C5 indb 27 9 2 2016 10 19 12 AM...
Страница 29: ...29 5 5 2 1 A 2U 4 12 24 A 2 A A B B 16 04 227 9335C5 indb 29 9 2 2016 10 19 13 AM...
Страница 30: ...30 5 3 6 32 4 12 24 8U SRWF12U38 12U SRWF16U38 A 4U B 5 2 A B 16 04 227 9335C5 indb 30 9 2 2016 10 19 13 AM...