Contaminants to be collected – such as oils in vaporous 
state – must be condensed into particulate form prior to 
entering the ionizing-collecting cells in order to maintain 
the anticipated efficiency. Gases, vapors or any non-
particulate cannot be precipitated and will therefore 
pass through the air cleaner. Any condensing that takes 
place downstream from the air cleaner defeats the 
purpose. Similarly, heavy concentrations of water vapor, 
or other matter that becomes highly conductive when 
condensed, must be prevented from entering and/or 
condensing in the collecting elements to prevent 
electrical arc over and shorting. 
 

ELECTRICAL INSTALLATION

 
All units must be wired directly in the junction box on the 
access door side of the unit. Use NEC Class I wiring 
methods. Size branch circuit protection in accordance 
with the NEC. Refer to the appropriate enclosed wiring 
diagram in the attached figures. 
 

WARNING: 

EXERCISE ALL THE NORMAL PRECAUTIONS 
WHEN WORKING WITH HIGH VOLTAGE AND 
COMPLY WITH NEC AND ALL APPROPRIATE 
LOCAL CODES. 

 
 

Check Out for System Start-up 

When the installation has been completed, assure that 
the equipment is ready for start-up by checking the 
following: 
 
A.  All construction debris is removed from the ionizing-

collecting cells, drain connections and ductwork. 

B.  The drain line from the Trion drain basin is clear and 

completely connected to its point of termination. 

C.  Supply line power is available and electrical wiring 

is completed to the junction box. 
 

 

IV. MAINTENANCE 

 

The following instructions are for use by qualified 
personnel. 
 

WARNING 

RISK OF ELECTRIC SHOCK 

These serving instructions are for use by qualified 
personnel only. To reduce the risk of electric shock, 
do not perform any servicing other than that 
contained in the operating instructions unless you 
are qualified to do so. 

 
 
 

SAFETY NOTE: 

Factory designed access to all electrically charged 
high voltage components contain electrical 
interlocks for the safety of operating personnel. Any 

additional access that may be provided in the 
system, where there is access to high voltage, must 
be equipped with such interlocks. Interlocks are 
readily available from the factory. 

 

 

Cleaning

 
To maintain optimum collection efficiency, the pre-filters 
and ionizer/collector cells should be removed 
periodically and soaked in a solution of hot water and 
Trion Tridex detergent for 2 to 4 hours, rinsed 
thoroughly and then air dried completely before 
reinstalling in the unit.  
The frequency of cleaning is dependent on the type of 
contaminant being collected. Liquid aerosol requires 
less cleaning while welding smoke may require more 
frequent cleaning. 
 

Note: Trion Tridex Detergent is specially formulated 
for use with Trion electronic air cleaners. Use of 
other cleaners and detergents, not specifically 
approved by Trion, can cause possible failures in 
the unit and will void any and all warranties on our 
equipment. 

 
 

 

 

Wash Ionizing/ Collecting Cells

 

WARNING: 

DO NOT USE HIGH PRESSURE STEAM CLEANING 
EQUIPMENT TO CLEAN CELLS. THE EXCESSIVE 
HEAT AND PRESSURE WILL CAUSE THE PLATES 
TO WARP AND IN TURN POSSIBLY CAUSE 
EXCESSIVE ARCING.

 

 
1.  Turn the control switch “OFF” and disconnect power 

to the unit. 

 
2.  Open the cell access door. 
 
3.  Remove ionizer/collector cells and wash in HOT 

detergent water. If the collected contaminant is of 

 

6

Содержание Air Boss T1001 Module

Страница 1: ... Module T2002 Module T1300 T2600 INSTALLATION OPERATION SERVICE Electrostatic Precipitators for Commercial Industrial Applications 101 McNeill Road Sanford NC 27330 919 775 2201 Fax 919 777 6399 800 884 0002 www trioninc com T NO 149869 001 MANUAL PAR June 2004 4 ...

Страница 2: ...s 4 Unit Operation 4 Ducting Application 5 Liquid Aerosol Installation 5 Electrical Installation 6 Cleaning 6 Inspections 7 VI W T1001 T2002 7 T1300 T2600 7 Troubleshooting Diagram 8 Figure 1 T1300 Unit 9 Figure 2 T2600 Unit 10 Figure 3 T1001 Unit 11 Figure 4 T2002 Unit 12 Figure 5 Enclosure Assembly 13 Figure 6 Blower Assembly 14 Figure 7 Blower Assembly Bill of Material 15 Figure 8 Ionizer Colle...

Страница 3: ...1300A 230V 60 HZ 1 PH 3 4 5 6 T1300B 230V 60 HZ 3 PH 1 3 6 T1300C 460V 60 HZ 3 PH 1 1 8 T1300D 575V 60 HZ 3 PH 1 1 6 T1300E 230V 50 HZ 1 PH 3 4 5 9 T1300N 208V 60 HZ 3 PH 1 3 6 T2600 120V 60 HZ 1 PH 3 4 11 3 T2600A 230V 60 HZ 1 PH 3 4 5 7 T2600B 230V 60 HZ 3 PH 1 3 7 T2600B 230V 60 HZ 3 PH 2 6 5 T2600C 460V 60 HZ 3 PH 1 1 9 T2600C 460V 60 HZ 3 PH 2 3 3 T2600D 575V 60 HZ 3 PH 1 1 7 T2600E 230V 50 H...

Страница 4: ...ollector designed to remove up to 95 of the dust smoke liquid aerosol and other pollutants from the air passing through it HOW IT OPERATES Polluted air is drawn into the unit by the belt driven blower on a T1300 or T2600 unit The T1001 and T2002 units require an external air handler to move the air After passing through a pre filter the particles in the air are given an electrical charge supplied ...

Страница 5: ...READ THOROUGHLY 1 Carefully unpack unit from shipping crate or carton and examine for damage in shipment 2 Remove ionizer collector cell s pre filters and after filters 3 Attach 500 pound 227 kg test chain to the ceiling joist using a Wood joist 3 8 m10 eye bolts b Metal joist wrap chain around joist at least twice and secure with 500 pound 227 kg test connecting link 4 Chain should be cut to allo...

Страница 6: ...personnel WARNING RISK OF ELECTRIC SHOCK These serving instructions are for use by qualified personnel only To reduce the risk of electric shock do not perform any servicing other than that contained in the operating instructions unless you are qualified to do so SAFETY NOTE Factory designed access to all electrically charged high voltage components contain electrical interlocks for the safety of ...

Страница 7: ...xploded views VI WARRANTY All Trion Electronic Air Cleaners are warranted for 3 Year Limited Warranty on units and 1 Year Limited Warranty on replacement parts Labor is NOT included Do not return defective parts without permission from the factory and receiving a material return acceptance number VII TROUBLESHOOTING GUIDE T1001 T2002 Problems and Possible Causes 1 Indicating Light Out a Unit not p...

Страница 8: ...9 ...

Страница 9: ...10 ...

Страница 10: ...11 ...

Страница 11: ...12 ...

Страница 12: ...13 ...

Страница 13: ...14 ...

Страница 14: ...Blower Motor Assembly FIG 6 15 ...

Страница 15: ...16 ...

Страница 16: ...17 ...

Страница 17: ...18 ...

Страница 18: ...19 ...

Страница 19: ...20 ...

Страница 20: ...21 ...

Страница 21: ...22 ...

Страница 22: ... Boscstr 60 No 728 Fuzhou Road D 50171 Kerpen Rm 3002 3005 Germany Raffles City Office Tower Tel 49 0 2237 922 103 Shanghai P R China 200001 Fax 49 0 2237 922 104 Tel 86 21 63403232 Email info trion deutschland de Fax 86 21 63403867 Fedders International Fedders International Inc Air Conditioning 128 Joo Seng Road A 30 Chintels House 05 01 Kalish Colony DP Computers Building New Delhi Singapore 36...

Отзывы: