background image

see “Troubleshooting Chart”, for additional causes of 
arcing. 
 
The louvers on the grill are adjustable so the direction of 
airflow can be controlled as desired. 
 

NOTE

: The unit is equipped with an interlock switch for 

your safety. The unit will not operate if the cell access 
door is not closed securely. 
 

NOTE:

 an interlock switch does not protect the blower 

access door on the T1300 and T2600. Do not attempt to 
operate the unit unless the door is fastened securely. 
 

DUCTING APPLICATION

 
The T1300 and T2600 air cleaners are designed for 
both free hanging applications and limited duct system 
applications. The duct systems must be carefully 
designed to keep the external static pressure to a 
minimum while still moving the required amount of air. 
Some added static pressure could be overcome by 
adjusting the blower drive pulleys or using a more 
powerful motor. Capture hoods and duct design 
information may be obtained from the Industrial 
Ventilation Handbook or from your local Trion 
representative. 
 
To maintain the selected cleaning efficiency, it is 
important to assure that the total air volume (capacity in 
CFM or m3/hr) is uniformly distributed across the entire 
face area of the unit. The metal mesh filters, perforated 
plate or mist suppressors provide some resistance to 
effect even air distribution. However, since most air 
ducts are designed to handle air velocities greater than 
the rated velocity of the air cleaner, it is necessary to 
properly transition any attached ducting. If possible, a 
contraction ratio of 1 in 3 (approximately 20

°

) should be 

maintained. If space prohibits, turning vanes, air baffles 
or other means may be utilized. Ducting – where 
attached to the cabinet collars – should be gasketed, 
caulked or otherwise made watertight. 
 

 III. INSTALLATION – READ THOROUGHLY  

 
1.  Carefully unpack unit from shipping crate or carton 

and examine for damage in shipment. 

 
2. Remove ionizer/collector cell(s), pre-filters and 

after-filters. 

 
3.  Attach 500 pound (227 kg) test chain to the ceiling 

joist using: 
a.  Wood joist – 3/8”  (m10) eye bolts 
b.  Metal joist – wrap chain around joist at least 

twice and secure with 500 pound (227 kg) test 
connecting link 

 
4.  Chain should be cut to allow the unit to hang from a 

predetermined height from the floor. (Usually 10-12 
feet or 3.0-3.6 m). 

 

5.  The unit is equipped with a locator dimple in each 

corner on the top and bottom. Using the dimples as 
a guide, drill (4) 13/32” dia. (10.3 mm) holes that will 
be required for mounting the eyebolts, which are 
attached to the suspension chain. 

 
6.  Position a 3/8”  (m10) diameter eyebolt (or larger) in 

each hole and secure with a washer and 
appropriate nuts.  

NOTE

: Be sure to place two nuts on each eyebolt to 

act a locking nut. Failure to do so may cause the 
nuts to loosen and the unit to fall. 

 
7.  Using 3/8” (10 mm) connecting links, attach unit to 

chain. Use turnbuckles on diagonally opposite 
chains.  

NOTE:

 Foul threads on turnbuckles after leveling 

unit to ensure that the turnbuckle will not "“back off" 
or loosen and cause the unit to fall. 

 
8.  The units can be suspended with the direction of 

airflow from the right to left. If a left to right airflow is 
desired, the unit may be flipped over and the 
eyehooks installed in what was originally the 
bottom. 

 

 

  

LIQUID AEROSOL APPLICATION 

INSTALLATIONS 

  
The unit is equipped with a sump, drain hole sized to 
accept a ½” NPT fitting.  
For the collection of liquid contaminant: 
 
1.  Install drain fitting to allow for the attachment of a 

liquid collection cup or drain hose. A drain fitting is 
available from your representative. An “S” trap is 
required in the drain hose to ensure proper drainage 
of the collected liquid. 

 
2.  Raise the front corner of the unit, opposite of the 

drain corner, ½”  (13 mm) to enable the collected 
liquid to flow to the drain sump. 

 
 

 

5

Содержание Air Boss T1001 Module

Страница 1: ... Module T2002 Module T1300 T2600 INSTALLATION OPERATION SERVICE Electrostatic Precipitators for Commercial Industrial Applications 101 McNeill Road Sanford NC 27330 919 775 2201 Fax 919 777 6399 800 884 0002 www trioninc com T NO 149869 001 MANUAL PAR June 2004 4 ...

Страница 2: ...s 4 Unit Operation 4 Ducting Application 5 Liquid Aerosol Installation 5 Electrical Installation 6 Cleaning 6 Inspections 7 VI W T1001 T2002 7 T1300 T2600 7 Troubleshooting Diagram 8 Figure 1 T1300 Unit 9 Figure 2 T2600 Unit 10 Figure 3 T1001 Unit 11 Figure 4 T2002 Unit 12 Figure 5 Enclosure Assembly 13 Figure 6 Blower Assembly 14 Figure 7 Blower Assembly Bill of Material 15 Figure 8 Ionizer Colle...

Страница 3: ...1300A 230V 60 HZ 1 PH 3 4 5 6 T1300B 230V 60 HZ 3 PH 1 3 6 T1300C 460V 60 HZ 3 PH 1 1 8 T1300D 575V 60 HZ 3 PH 1 1 6 T1300E 230V 50 HZ 1 PH 3 4 5 9 T1300N 208V 60 HZ 3 PH 1 3 6 T2600 120V 60 HZ 1 PH 3 4 11 3 T2600A 230V 60 HZ 1 PH 3 4 5 7 T2600B 230V 60 HZ 3 PH 1 3 7 T2600B 230V 60 HZ 3 PH 2 6 5 T2600C 460V 60 HZ 3 PH 1 1 9 T2600C 460V 60 HZ 3 PH 2 3 3 T2600D 575V 60 HZ 3 PH 1 1 7 T2600E 230V 50 H...

Страница 4: ...ollector designed to remove up to 95 of the dust smoke liquid aerosol and other pollutants from the air passing through it HOW IT OPERATES Polluted air is drawn into the unit by the belt driven blower on a T1300 or T2600 unit The T1001 and T2002 units require an external air handler to move the air After passing through a pre filter the particles in the air are given an electrical charge supplied ...

Страница 5: ...READ THOROUGHLY 1 Carefully unpack unit from shipping crate or carton and examine for damage in shipment 2 Remove ionizer collector cell s pre filters and after filters 3 Attach 500 pound 227 kg test chain to the ceiling joist using a Wood joist 3 8 m10 eye bolts b Metal joist wrap chain around joist at least twice and secure with 500 pound 227 kg test connecting link 4 Chain should be cut to allo...

Страница 6: ...personnel WARNING RISK OF ELECTRIC SHOCK These serving instructions are for use by qualified personnel only To reduce the risk of electric shock do not perform any servicing other than that contained in the operating instructions unless you are qualified to do so SAFETY NOTE Factory designed access to all electrically charged high voltage components contain electrical interlocks for the safety of ...

Страница 7: ...xploded views VI WARRANTY All Trion Electronic Air Cleaners are warranted for 3 Year Limited Warranty on units and 1 Year Limited Warranty on replacement parts Labor is NOT included Do not return defective parts without permission from the factory and receiving a material return acceptance number VII TROUBLESHOOTING GUIDE T1001 T2002 Problems and Possible Causes 1 Indicating Light Out a Unit not p...

Страница 8: ...9 ...

Страница 9: ...10 ...

Страница 10: ...11 ...

Страница 11: ...12 ...

Страница 12: ...13 ...

Страница 13: ...14 ...

Страница 14: ...Blower Motor Assembly FIG 6 15 ...

Страница 15: ...16 ...

Страница 16: ...17 ...

Страница 17: ...18 ...

Страница 18: ...19 ...

Страница 19: ...20 ...

Страница 20: ...21 ...

Страница 21: ...22 ...

Страница 22: ... Boscstr 60 No 728 Fuzhou Road D 50171 Kerpen Rm 3002 3005 Germany Raffles City Office Tower Tel 49 0 2237 922 103 Shanghai P R China 200001 Fax 49 0 2237 922 104 Tel 86 21 63403232 Email info trion deutschland de Fax 86 21 63403867 Fedders International Fedders International Inc Air Conditioning 128 Joo Seng Road A 30 Chintels House 05 01 Kalish Colony DP Computers Building New Delhi Singapore 36...

Отзывы: