![Trinity 620005 Скачать руководство пользователя страница 6](http://html1.mh-extra.com/html/trinity/620005/620005_assembly-manual_1163300006.webp)
TrinityHighway.com
5
Revision F November 2021
about this, please contact the state/specifying
agency that specified CASS
®
S3 at this particular
location for guidance. Trinity Highway is available
for consultation with that agency.
Warning:
Do not allow pedestrians or workers to
stand near this system, when under tension, in
circumstances where the cable may be impacted
or cut. Failure to follow this warning can result in
serious injury or death to the workers, bystanders
and/or pedestrians in the event of a vehicle
impact with the system.
Warning:
It is imperative, before assembly, that
you contact a Trinity Highway representative and
state/specifying agency engineer for special
criteria for soils which do not meet or exceed
NCHRP Report 350 soil conditions. It is also
recommended that you consult your own soils or
structural engineer.
Warning:
Be aware of hazards of using
compressed air (small objects may become
projectiles). Failure to follow this warning can
result in serious injury or death to the workers
and/or bystanders.
Warning:
When drilling rock, it is the
responsibility of the installer to consult
Occupational Safety & Health Administration
(“OSHA”) silica respiratory standard 29 Code of
Federal Regulation (“CFR”) 1910.134 for debris
removal and ensure compliance.
Warning:
Ensure that CASS
®
S3 delineation
used meets all federal, state/specifying agency
specifications.
Warning:
CASS
®
S3 shall be placed on a
median or roadside without obstructions,
depressions, etc. that may significantly affect the
stability of an errant vehicle. Grading of the site
and/or appropriate fill materials may be required.
The assembler shall “flatten” or “round” various
topographical inconsistencies that could interfere
with the ability to consistently maintain the design
height (in relation to the terrain) of the cables.
To address assembly in rock, see Appendix C:
Encountering Rock.
Note:
Based on soil conditions at the site, ANY or
ALL foundations may need larger/deeper concrete
footings or larger soil plates (for driven
applications) as determined by soil analysis.
Содержание 620005
Страница 1: ......
Страница 39: ...TrinityHighway com 38 Revision F November 2021 Appendix B Cable Barrier Overlap...
Страница 42: ......