9.2 INSPECTION OF THE STARFLOW V
TM
9.2.1 GENERAL RECOMMENDATIONS
We recommend to carefuly stock the disassembled valves per serial number not to mixup parts during
inspection and maintenance. Changes from one valve part to another can be invisible to the eye and may
compromit perfect valve operation during its whole life cycle.
The tools to use must be adequate in order to prevent the part damage. It is particularly true with sliding
surfaces and sealing ones.
5
33
3
2
9
1
6
26
90
29
30
14
15
113
104
47
46
45
50
35
13
22
DETAIL A
89
89
91
17
18
28
8
7
11
56
12
10
95
9.2.2 PART INSPECTION
•
Body (1)
Inspect the body for any cracks, erosion, pitting. Outlet flange gasket seating area shall be in proper
condition without any impact marks. If the body has such defects it shall be replaced.
•
Boltings (35+50)
Studs and nut shall be free of rust, and threads free of deformation and impact marks. If studs and nuts are
not in perfect shape the defected ones shall be replaced.
26
|
www.trilliumflow.com
STARFLOW V
™
PRESSURE RELIEF VALVE
SARASIN-RSBD
™