44 | Appendix A Grounding Guidelines
Run the CAT5 cable inside the tower structure, tying the cable to the tower leg
at every 4 feet of length. For increased protection, run the CAT5 cable through
metallic conduit installed on the tower.
Bleed off any static charge by installing a streamer-delaying, static-dissipation
array above the SkyPilot device.
Install all lightning and surge protection devices in accordance with UL 96A
installation requirements for lightning protection systems and the NFPA 780
standard for lightning protection.
A
Содержание SkyPilot Gateway Pro
Страница 8: ...viii About This Guide...
Страница 14: ...6 Chapter 1 Introduction...
Страница 40: ...32 5 Installing the SkyPilot Gateway Pro...
Страница 48: ...40 6 Verifying Connectivity...
Страница 56: ...52 Appendix C Specifications...