www.trilithic.com
Page I-20
120 DSP Operation Manual
Basic Signal Level Meter
120
Battery Charging
Before you can use your instrument, you will need charge its batteries. Your instrument’s
Li-Ion batteries (two internal) provide approximately 6 hours of power during continuous
operation.
The instrument comes with a AC to DC Power Adapter & Battery Charger which can be used
to charge the batteries in approximately 6 hours or to trickle charge the batteries while the
instrument is in use.
Plug the power adapter & battery charger into the DC charge port of the 120 DSP on the
bottom of the instrument under a protective cover.
Your instrument is equipped with a “smart” battery charging circuit so that the charging method
(fast or trickle) is an auto function. Fast Charge is used to charge the battery quickly. Trickle
Charge is used to keep the battery fully charged.
Every time your instrument is plugged into the charging cube, it starts charging automatically
via the Trickle Charge method. If the unit determines Fast Charge is necessary, it defaults to
the Fast Charge method.
Содержание 120 DSP
Страница 17: ...www trilithic com 120 DSP Basic Signal Level Meter Section I The Basics ...
Страница 57: ...www trilithic com 120 DSP Basic Signal Level Meter Section II Setup Menu ...
Страница 128: ...www trilithic com Page II 72 120 DSP Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK Basic Signal Level Meter 1 20 ...
Страница 150: ...www trilithic com Page II 94 120 DSP Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK Basic Signal Level Meter 1 20 ...
Страница 151: ...www trilithic com 120 DSP Basic Signal Level Meter Section III Autotest Menu ...
Страница 152: ...www trilithic com Page III 2 120 DSP Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK Basic Signal Level Meter 1 20 ...
Страница 154: ...www trilithic com Page III 4 120 DSP Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK Basic Signal Level Meter 1 20 ...
Страница 168: ...www trilithic com Page III 18 120 DSP Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK Basic Signal Level Meter 1 20 ...
Страница 169: ...www trilithic com 120 DSP Basic Signal Level Meter Section IV Troubleshoot Menu ...
Страница 170: ...www trilithic com Page IV 2 120 DSP Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK Basic Signal Level Meter 1 20 ...
Страница 172: ...www trilithic com Page IV 4 120 DSP Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK Basic Signal Level Meter 1 20 ...
Страница 212: ...www trilithic com Page IV 44 120 DSP Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK Basic Signal Level Meter 1 20 ...
Страница 230: ...www trilithic com Page IV 62 120 DSP Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK Basic Signal Level Meter 1 20 ...
Страница 279: ...www trilithic com 120 DSP Basic Signal Level Meter Section V Appendix ...
Страница 280: ...www trilithic com Page V 2 120 DSP Operation Manual THIS PAGE LEFT INTENTIONALLY BLANK Basic Signal Level Meter 1 20 ...
Страница 288: ...9710 Park Davis Drive Indianapolis IN 46235 317 895 3600 www trilithic com Made in U S A ...