![Triconex Trident Скачать руководство пользователя страница 180](http://html.mh-extra.com/html/triconex/trident/trident_planning-and-installation-manual_1162141180.webp)
164
Controller Verification
Trident Planning and Installation Guide
Controller Verification
After the controller is installed and before running an application, verify that the
controller is operational.
▼
To verify the controller:
1
Verify that the controller is properly grounded according to directions in
“Effective Grounding Methods” on page 149
2
Remove incoming power, install I
⁄
O and extension bus wiring, and perform a
static check of the wiring.
3
Before connecting field I
⁄
O wiring, apply power to each baseplate.
4
Within five minutes, verify that the green Pass indicators on the MPs and all I
⁄
O
modules go on.
5
Connect the TriStation PC to the appropriate port on the MP.
6
Connect the field I
⁄
O wiring and devices.
7
Verify that all process equipment connected to the controller is disabled to
prevent accidental start-up of the equipment during testing.
8
Turn on power to the controller and the TriStation PC.
9
Download the TriStation
project.
10
Using the TriStation Control Panel, test all inputs and outputs.
11
To verify the connections of all I
⁄
O points to the field wiring, use the TriStation
Control Panel.
12
With output devices disabled, use TriStation facilities to verify the application.
13
When satisfied that the application is operating properly, enable the output
devices and the process equipment according to the safety requirements for your
environment.
You have now made every effort to ensure that your Trident controller is problem-
free. However, should problems arise, please call a Triconex Field Service
Engineer before starting up your process-control operation.
Содержание Trident
Страница 1: ...Trident Version 1 2 Triconex An Invensys Company Planning and Installation Guide ...
Страница 10: ...x Contents Trident Planning and Installation Guide ...
Страница 16: ...xvi Training Trident Planning and Installation Guide ...
Страница 53: ...Main Processor Module 37 Chapter 3 System Description Model 2101 Main Processor Baseplate ...
Страница 63: ...Communication Module 47 Chapter 3 System Description Model 2201 Communication Module Baseplate ...
Страница 106: ...90 Input Output Modules Trident Planning and Installation Guide Model 2401 Digital Output Baseplate ...
Страница 128: ...112 Input Output Modules Trident Planning and Installation Guide Model 2451 Solid State Relay Output Baseplate ...
Страница 140: ...124 Covers Trident Planning and Installation Guide ...
Страница 145: ...Guidelines 129 Chapter 4 Installation and Maintenance Depth Dimensions for Baseplate and Module ...
Страница 216: ...200 Replacing Modules Trident Planning and Installation Guide ...
Страница 238: ...222 Diagread Cables and Debug Connectors Trident Planning and Installation Guide ...
Страница 240: ...224 Trident Planning and Installation Guide ...
Страница 248: ...232 Trident Planning and Installation Guide ...
Страница 264: ...248 Glossary Trident Planning and Installation Guide ...
Страница 274: ...258 Index Trident Planning and Installation Guide ...