![background image](http://html1.mh-extra.com/html/triax/cgs-470/cgs-470_assembly-instruction-manual_1160809027.webp)
- 27 -
CGS 470
6
f
inal
proCedures
After installing the
head-end station
, upgrading accessories or installing mod-
ules it is necessary to tighten all cable connections, cable terminals and cover
screws in order to maintain compliance with current EMC regulations.
• Securely tighten the cable connections (F connectors) using an open-ended
spanner (spanner gap 11 mm).
• Test the output level of the output collector according to the CSE 2800 as-
sembly instructions and set the output level required for the cable system.
• Mount the base plate and the front cover (see CSE 2800 assembly instruc-
tions).