Step 21.
Crimp the conductor.
Step 22.
Inspect the crimp per required specifications.
Step 23.
Repeat Steps 19 through 22 for each conductor wire gauge to obtain
the necessary specimens; inspect per established procedure.
Step 24.
After all specimens have been produced, set the power on-off switch to
off and open the sleeve valve.
Step 25.
If crimps meet all established parameters, certify the TAC-17X for
production use, and establish a periodic verification schedule.
Содержание TAC 17X
Страница 5: ...Page 5 Figure 1 1 TAC 17X Front View ...
Страница 7: ...Page 7 Figure 1 2 Wire Insertion Through Funnel ...
Страница 10: ...Page 10 Primary air input at rear of TAC Figure 2 1 Pneumatic Hook Ups ...
Страница 16: ...Page 16 Crimp Inspection Points Improper Crimps Figure 3 3 Crimped Samples ...
Страница 25: ...Page 25 Figure 6 1 TAC 17X Pneumatic Control Panel ...
Страница 26: ...Page 26 Figure 6 2 TAC 17X Components Right View ...
Страница 38: ...Page 38 ...
Страница 39: ...Page 39 Carefully Remove Hose Clamp ...
Страница 42: ...Page 42 ...
Страница 47: ...Page 47 Figure 7 3 TAC 17X Pneumatic Diagram ...