Page 35
Step 21.
Crimp the conductor.
Step 22.
Inspect the crimp per required specifications.
Step 23.
Repeat Steps 19 through 22 for each conductor wire gauge to obtain
the necessary specimens; inspect per established procedure.
Step 24.
After all specimens have been produced, set the power on-off switch to
off and open the sleeve valve.
Step 25.
If crimps meet all established parameters, certify the TAC-10X for
production use, and establish a periodic verification schedule.
Содержание TAC-10X
Страница 5: ...Page 5 Figure 1 1 TAC 10X Front View ...
Страница 7: ...Page 7 Figure 1 2 Wire Insertion Through Funnel ...
Страница 10: ...Page 10 Figure 2 1 Pneumatic Hook Ups Air Off Air On ...
Страница 12: ...Page 12 Figure 2 3 Shoulder less Track Assembly Track Assembly Figure 2 4 Shoulder less Track Assembly ...
Страница 16: ...Page 16 Crimp Inspection Points Improper Crimps Figure 3 3 Crimped Samples ...
Страница 24: ...Page 24 Figure 6 1 TAC 10X Pneumatic Control Panel ...
Страница 25: ...Page 25 Figure 6 2 TAC 10X Components Right View ...
Страница 26: ...Page 26 PLC Controller Switching Power Supply Figure 6 3 TAC 10X Components Left View ...
Страница 30: ...Page 30 ...
Страница 31: ...Page 31 Carefully Remove Hose Clamp ...
Страница 34: ...Page 34 ...
Страница 38: ...Page 38 Figure 7 3 TAC 10X Pneumatic Diagram ...