25
H
O
W T
O I
N
S
T
A
L
L D
E
C
K
IN
G
1
1
1
1
1
2
1/4" >40°F*
1/2" <40°F*
3
2
1
1
2
4
5
6
Rout one side of board (last stair tread).
7
Installing Trex
®
Stair Treads
Installed with Hidden Fasteners
NOTE:
Use square-edge, composite decking boards and manually route these on required sides to allow for use with
hidden fasteners.
*6mm >4˚C 3mm <4˚C
Содержание SELECT
Страница 1: ...2020 DECKING INSTALLATION GUIDE ...
Страница 7: ...7 PLANNING AHEAD PLANNING AHEAD ...
Страница 10: ...10 DECKING DECKING ...
Страница 26: ...26 WARRANTIES WARRANTIES ...
Страница 30: ...30 NOTES ...