SILT FENCING

1-800-295-5510

uline.com

1.  Using a shovel or backhoe (not included), dig a 

trench line approximately 6" deep by 6" wide where 

the silt fencing is to be placed. (See Figure 1)

NOTE: Avoid placing silt fencing on steep 
slopes.

2.  Unroll and extend silt fencing along trench line.  

(See Figure 2)

3.  Drive the end stake into ground using a rubber 

mallet (not included) so that at least 6" of fabric sits 

inside the trench. (See Figure 3)

NOTE: A red reference line is printed on the 
fabric 6
" from the bottom.

4.  Continue driving the remaining posts into the ground, 

starting with the post adjacent to end post. 

NOTE: Ensure fabric is pulled taut between 
posts.

5.  Backfill trench with dirt and pack so that fabric is 

securely buried in the ground. (See Figure 4)

MAINTENANCE

•  Check silt fencing periodically for damage, 

especially after heavy rainfall.

•  Remove excess sediment.

•  Replace silt fencing every five to eight months.

INSTALLATION

Figure 1

Figure 4

Figure 2

Figure 3

6"

π

  CHICAGO • ATLANTA • DALLAS • LOS ANGELES • MINNEAPOLIS • NYC/PHILA • SEATTLE • MEXICO • CANADA

Para Español, vea página 2.

Pour le français, consulter la page 3.

Отзывы: