Trelleborg SCN 1000 Скачать руководство пользователя страница 27

26

For a smarter approach to 

your next project,  

get in touch today.

Email:

 [email protected]

Содержание SCN 1000

Страница 1: ...TRELLEBORG MARINE AND INFRASTRUCTURE Parallel Motion Fenders Handling Storage Installation and Maintenance Manual...

Страница 2: ...ith customers to determine best fit solutions for specific applications and supply a fully integrated solution End to end service and a comprehensive product portfolio meet and exceed customer needs e...

Страница 3: ...quality materials ensure a long low maintenance service life no matter how demanding the working and environmental conditions All fenders are supplied fully tested and meet PIANC 2002 guidelines Our...

Страница 4: ...inite engineering analyses and calculations for both our fender systems and marine technology solutions DESIGN Our entire product range is manufactured in house meaning we have full control over the d...

Страница 5: ...acturing process We ensure that life cycle and performance of our entire product range meets your specifications and more TESTING Local support on a truly global scale with customer support teams all...

Страница 6: ...eously allows the panel to rotate on plan to accommodate large berthing angles Parallel Motion Fenders can absorb the full design energy irrespective of impact level As Parallel Motion Fenders are mos...

Страница 7: ...rotation to accommodate berthing angles also eliminating moments in the hinge pin 5 UHMW PE face pads Trelleborg Double Sintered UHMW PE face pads are standard to minimize friction and maximize servic...

Страница 8: ...TICE Reverse mounted twin cone fender PMF system installed on concrete structure Standard mounted twin cone fender PMF system installed on concrete structure Reverse mounted twin cone fender PMF syste...

Страница 9: ...8 Parallel Motion Fender System PROVEN IN PRACTICE Reverse mounted single cone fender PMF system installed on concrete structure MV fender PMF system...

Страница 10: ...9 The Parellel Motion Fenders PMF unit will be delivered completely plastic wrapped and protected with suitable paddings at the base and corners Handling...

Страница 11: ...ck trailer so that the lifting points are exposed Lifting point locations and sizes are subject to change based on the project requirement Refer to the General Arrangement drawing for details A Spread...

Страница 12: ...11 Storage At all times all equipment must be stored properly to avoid any damage environmental damage or damage occurring from nearby moving equipment...

Страница 13: ...8 in 0 18 0 20 mm For long term storage 6 months use heavy duty tarp with an approximate thickness of 0 011 0 012 in 0 28 0 30 mm The tarpaulin must be tightly bound using nylon straps making sure tha...

Страница 14: ...13 Installation...

Страница 15: ...second fender on the Sandwich plate such that the bolt holes are aligned Insert and torque the bolts Recommendations After inserting the bolts only turn enough to ensure the threads are engaged and i...

Страница 16: ...torque values should be used when fastening to steel Refer to MN I M RUB SCN SCK v1 0 EN 2017 for fender lifting methods Installing MV fenders Place the frontal frame face down to the ground supporte...

Страница 17: ...ents Equipment Required Information Fasteners Supplied by Trelleborg Spanner Suitable to the supplied bolt size 2 2 1 Installation on concrete structure Unfasten ropes which connect the mounting brack...

Страница 18: ...asten the fender with the supplied hardware shown in the general arrangement and anchor layout drawings Recommendations Use the standard bolt torque values when fastening to the steel Use torque value...

Страница 19: ...te plant requirements Equipment Required Information Fasteners Supplied by Trelleborg While installing on steel pile Mounting of the hole locations and connecting plate sizes of the pile structure mus...

Страница 20: ...19 Maintenance and Inspection...

Страница 21: ...are still in place and are operating normally without excessive clearance External visual checks should be possible without stripping down the fender If the bearings have excessive play or are damaged...

Страница 22: ...279 M56 2812 SCN 1600 264 M48 2281 SCN 1400 203 M42 1531 SCN 1300 177 M42 1338 SCN 1200 167 M42 1259 SCN 1100 128 M36 826 SCN 1050 143 M36 923 SCN 1000 131 M36 846 SCN 950 117 M30 632 SCN 900 107 M30...

Страница 23: ...350 14 M16 39 SCN 300 11 M16 30 SCN FENDERS F0 7 TO F1 8 k 0 18 for hot dip galvanized screw threads with normal metric thread clean and dry ungreased k 0 15 for bolts with normal metric thread clean...

Страница 24: ...Installation Inspection Maintenance Manual for Fender system MN I M RUB SCN SCK v1 0 EN 2017 Handling Storage Installation Inspection Maintenance Manual for SCN SCK Rubber Fender MN I M RUB MV UE v1 0...

Страница 25: ...24...

Страница 26: ...nd performance of our products and systems we reserve the right to make specification changes without prior notice All dimensions material properties and performance values quoted are subject to norma...

Страница 27: ...26 For a smarter approach to your next project get in touch today Email marine_infra trelleborg com...

Страница 28: ...omers in a sustainable way Trelleborg Marine and Infrastructure Email marine_infra trelleborg com www trelleborg com MARINEandinfrastructure facebook TrelleborgMarineandInfrastructure twitter Trellebo...

Отзывы: