
10
Handling
MATeriAlS / conSuMABleS required
inForMATion
Timber / rubber blocks
After unloading, all the equipment must be placed on
timber / rubber blocks to avoid damage to the plastic
or painted surfaces.
equiPMenT required
inForMATion
crane
refer to the general Arrangement drawing for the total
weight of the equipment.
rigging equipment with spreader beam
refer to the general Arrangement drawing for the total
weight of the equipment.
❙
unwrap the plastic packaging of the PMf unit with
necessary tools
caution
The unwrapping operation must be performed on
the truck trailer so that the lifting points are
exposed. lifting point locations and sizes are subject
to change based on the project requirement. refer
to the general Arrangement drawing for details.
❙
A spreader beam of suitable length & load rating
must be used to lift the PMf unit from the truck
trailer.
recommendation
In the event of non-availability of a spreader beam,
two separate lifting hooks can be used.
caution
❙
lifting rope angles must be set in a way that they
do not scrape off any painted surfaces. Paint
damage while lifting is not covered under warranty
& the damages must be repaired.
❙
do not walk under suspended loads.the general
Arrangement drawing for details.
Figure 2
: unwraped PMf unit on truck trailer
Figure 3
: lifting the PMf unit with a spreader beam
Содержание SCN 1000
Страница 14: ...13 Installation...
Страница 20: ...19 Maintenance and Inspection...
Страница 25: ...24...
Страница 27: ...26 For a smarter approach to your next project get in touch today Email marine_infra trelleborg com...