13
Pre-Installation
Fusion SKI
bathtub
EN
IN
IN
IN
IN
ø40
ø40
Electrical connect
ion
Electrical connect
ion
Drain
Drain
Room for
the electrical
connections
Room for
the electrical
connections
Water supply
Water
supply
Technical
inspection
port
2
WHAT PREPARATIONS ARE REQUIRED?
To be installed, the bathtub requires:
1
Identification of the installation site.
2
Preparation of the installation site.
3
Preparation of the plumbing.
4
Preparation of the electrical system.
The following pages will provide detailed
explanations of how to perform these
preparations.
EXAMPLES OF BATHTUB INSTALLA-
TION
Содержание Fusion SKI
Страница 1: ...Fusion SKI bathtub Pre installation manual EN ...
Страница 22: ...Notes Notes ...