11
Pre-Installation
Fusion SKI
bathtub
EN
120
220
220
120
180
230
230
180
150
30
95
20
20
10
ø40
A
F
A
C
B
90
30
90
20
20
10
ø40
A
F
A
C
B
10
20
20
95
ø40
A
F
A
C
B
30
150
10
20
20
90
ø40
A
F
A
C
B
30
90
C
C
C
C
Standard left
version
Right version on
request
10
20
20
95
30
150
ø40
A
F
A
C
B
180
230
10
20
20
80
30
ø40
A
F
A
C
B
displa
y
10
20
20
95
30
ø40
A
F
A
C
B
150
230
C
C
C
A
Cold + hot water connection, 1/2" male
AF: cold water
AC: hot water
B
Floor drain ø40
C
Electrical connection (power cord type H05 with three wires (single-phase 230V)
Содержание Fusion SKI
Страница 1: ...Fusion SKI bathtub Pre installation manual EN ...
Страница 22: ...Notes Notes ...