background image

11

Pre-Installation

Fusion SKI

 

bathtub

 

EN

120

220

220

120

180

230

230

180

150

30

95

20

20

10

ø40

A

F

A

C

B

90

30

90

20

20

10

ø40

A

F

A

C

B

10

20

20

95

ø40

A

F

A

C

B

30

150

10

20

20

90

ø40

A

F

A

C

B

30

90

C

C

C

C

Standard left 

version

Right version on 

request

10

20

20

95

30

150

ø40

A

F

A

C

B

180

230

10

20

20

80

30

ø40

A

F

A

C

B

displa

y

10

20

20

95

30

ø40

A

F

A

C

B

150

230

C

C

C

  Cold + hot water connection, 1/2" male

 

AF: cold water

 

AC: hot water

 Floor drain ø40

  Electrical connection (power cord type H05 with three wires (single-phase 230V)

Содержание Fusion SKI

Страница 1: ...Fusion SKI bathtub Pre installation manual EN ...

Страница 2: ... you to read this manual carefully and to carefully follow all the information contained herein The Treesse team is always available for any information or request for assistance that may be required during preparation GRUPPO TRE S s p a Telephone 39 0761 527242 Fax 39 0761 527223 Email info gruppotres it Good luck with your work ...

Страница 3: ...PARATIONS ARE REQUIRED ________________________ 13 3 IDENTIFICATION OF THE INSTALLATION SITE___________________ 14 4 PREPARATION OF THE INSTALLATION SITE_____________________ 15 FREESTANDING INSTALLATIONS__________________________________________________________________15 RECESSED INSTALLATIONS_______________________________________________________________________16 5 PLUMBING PREPARATIONS________...

Страница 4: ...2 6 bar operating temperature 5 C min 45 C max Size in cm dimensional tolerances 5mm The manufacturer reserves the right to make improvements to the equipment at any time without prior notice Partial reproduction without the manufacturer s consent is prohibited Measurements are purely indicative and not binding The original language of this manual is Italian the Manufacturer is not responsible for...

Страница 5: ...y 1 0 2 0 2 0 9 5 3 0 ø40 AF AC B C C A Cold hot water connection 1 2 male AF cold water AC hot water B Floor drain ø40 C Electrical connection power cord type H05 with three wires single phase 230V 1 0 2 0 2 0 9 5 3 0 1 5 0 ø40 AF AC B 180 230 1 0 2 0 2 0 8 0 3 0 ø40 AF AC B display C C ...

Страница 6: ...sure 2 6 bar operating temperature 5 C min 45 C max Size in cm dimensional tolerances 5mm The manufacturer reserves the right to make improvements to the equipment at any time without prior notice Partial reproduction without the manufacturer s consent is prohibited Measurements are purely indicative and not binding The original language of this manual is Italian the Manufacturer is not responsibl...

Страница 7: ...2 0 9 5 3 0 ø40 AF AC B C C A Cold hot water connection 1 2 male AF cold water AC hot water B Floor drain ø40 C Electrical connection power cord type H05 with three wires single phase 230V 1 0 2 0 2 0 9 5 3 0 1 0 2 0 2 0 8 0 3 0 ø40 AF AC B display 1 0 2 0 2 0 9 5 3 0 ø40 AF AC B 150 230 C C ...

Страница 8: ... 45 C max Size in cm dimensional tolerances 5mm The manufacturer reserves the right to make improvements to the equipment at any time without prior notice Partial reproduction without the manufacturer s consent is prohibited Measurements are purely indicative and not binding The original language of this manual is Italian the Manufacturer is not responsible for any mistakes in translation interpre...

Страница 9: ...connection power cord type H05 with three wires single phase 230V 120 220 220 120 180 230 230 180 1 5 0 3 0 9 5 2 0 2 0 1 0 ø40 AF AC B 9 0 3 0 9 0 2 0 2 0 1 0 ø40 AF AC B 1 0 2 0 2 0 9 5 ø40 AF AC B 3 0 1 5 0 1 0 2 0 2 0 9 0 ø40 AF AC B 3 0 9 0 C C C C 1 0 2 0 2 0 9 0 ø40 AF AC B 3 0 9 0 C Standard left version Right version on request ...

Страница 10: ... operating pressure 2 6 bar operating temperature 5 C min 45 C max Size in cm dimensional tolerances 5mm The manufacturer reserves the right to make improvements to the equipment at any time without prior notice Partial reproduction without the manufacturer s consent is prohibited Measurements are purely indicative and not binding The original language of this manual is Italian the Manufacturer is...

Страница 11: ...ø40 AF AC B 1 0 2 0 2 0 9 5 ø40 AF AC B 3 0 1 5 0 1 0 2 0 2 0 9 0 ø40 AF AC B 3 0 9 0 C C C C Standard left version Right version on request 1 0 2 0 2 0 9 5 3 0 1 5 0 ø40 AF AC B 1 8 0 2 3 0 C A Cold hot water connection 1 2 male AF cold water AC hot water B Floor drain ø40 C Electrical connection power cord type H05 with three wires single phase 230V ...

Страница 12: ...a proper preparation of the environments and the plumbing and electrical connections This allows for a quick and safe installation The pre installation stages involve the following professionals A construction engineer for the calculation of the loading capacity of the platforms or floors A qualified and certified company that will prepare the installation site according to the instructions provid...

Страница 13: ...er supply Water supply Technical inspection port 2 WHAT PREPARATIONS ARE REQUIRED To be installed the bathtub requires 1 Identification of the installation site 2 Preparation of the installation site 3 Preparation of the plumbing 4 Preparation of the electrical system The following pages will provide detailed explanations of how to perform these preparations EXAMPLES OF BATHTUB INSTALLA TION ...

Страница 14: ...N Note that the evaporation of water in the bathtub in the presence of high internal temperatures can generate very high levels of humidity in the environment To overcome this drawback choose an environment with good natural or forced ventilation As an alternative install a dehumidification system Humidity damage is not covered by the manufacturer warranty Take into account the size of the bathtub...

Страница 15: ...e Wedges or shims cannot be placed under the bathtub to level it only the feet of the bathtub can be ad justed Remember to ground the structural reinforcement in accordance with electrical codes For the preparation of the water and electrical connections see the pertinent section on page 18 and 20 Flooring it is recommended to choose a flooring that minimises the possibility of slipping when getti...

Страница 16: ...ection port at least 50 cm wide on all sides of the bathtub This will make future maintenance or repairs easier B Drainage grating around the perimeter and in the recess to help preserve the equipment and the structure even for indoor installations C Flooring it is recommended to choose a flooring that minimises the possibility of slipping when getting in and out of the bathtub D Two Ø15 cm vents ...

Страница 17: ...00 56 measurements in cm measurements in cm See the plumbing and electrical preparations on page 18 and 20 A Technical compartment for maintenance of operational components plan for 50 cm on all sides of the bathtub B Internal drainage grates D 2 Ø15 cm vents to ensure proper ventilation of the technical compartment C Flooring it is recommended to choose a flooring that minimises the possibility o...

Страница 18: ... It is important that the water used be drinkable It is always advisable not to use well water because it may be very hard rich in metals like iron and manganese and have bacterial loads Tap water is recommended In the case of very hard or ferrous water it is always recommended to install softening and iron removal systems upstream The company cannot be held responsible for issues related to the u...

Страница 19: ...nection to the bathtub using the 1 2 inch female hoses provided Connect the drain of the floor bathtub The plumber is responsible for the choice and type of materials to be used and the verification of compliance with anti pollution standards The images are purely indicative the model and type must be chosen by the plumber based on the characteristics of the water and the current system EXAMPLE OF...

Страница 20: ...PARATIONS Controlled by a multi pole switch with a contact gap of at least 3 mm and a breaking capacity equal to 60A or in any case adequate for the absorption of the bathtub Controlled by a differential switch no larger than 30mA The control unit s power supply cable must be of the H05 type with three wires single phase 220V whose gauges are adequate for the absorption of the bathtub see pre inst...

Страница 21: ... CABLE CN8 CAVO LIV H2O CN8 H2O LEVEL CABLE CAVO A CABLEA CN19 CAVO A J5 1 GIALLO 2 VERDE DOCCINO J6 1 BIANCO 2 MARRONE EV DISINFEZIONE J7 1 GRIGIO 2 ROSA EV CARICO CABLE A J5 1 YELLOW 2 GREEN FLEXIBLE SHOWER J6 1 WHITE 2 BROWN DISINFECTION EV J7 1 GREY 2 PINK CHARGE EV J9 1 ROSSO 2 BLU EV SCARICO J11 1 NERO 2 VIOLA EV SCARICO J9 1 RED 2 BLUE DISCHARGE EV J11 1 BLACK 2 PURPLE DISCHARGE EV CN3 1 BI...

Страница 22: ...Notes Notes ...

Страница 23: ...be small differences between this manual and the product you have received we apologise in advance for any inconvenience The total or partial reproduction of this manual without the Manufacturer s consent is prohibited Measurements are purely indicative and not binding The original language of this manual is Italian the Manufacturer is not responsible for any mistakes in translation interpretation...

Страница 24: ...ion SKI pre installation Edition 12 2017 www gruppotreesse it GRUPPO TRE S s p a 01036 Nepi VT Italy S S Cassia km 36 400 Settevene industrial area tel 39 0761 527242 fax 39 0761 527223 info gruppotres it ...

Отзывы: