background image

TRANE

®

Electrical Wiring

15

Electrical wiring

General

All wiring should confirm to NEC or
applicable codes as per requirements
of local codes and regulations.  Wiring
diagrams are furnished with the units
but extra copies can be obtained from
Trane Sales Offices.

The installing contractor is to provide
and install fused disconnect switches,
wiring up to the unit (as indicated in the
wiring diagrams), water circulating
pumps and pump starting
equipments, cooling tower controls
and relays as indicated in the wiring
diagrams.  Electrical data on
compressors and evaporator fan
motors are available on Table 1.

Check the available power supply
against the nameplate information.
Voltage at the unit must be  6%
of the voltage indicated on the
nameplate.  Voltage within the phases
must be balanced within 2%.

All factory supplied wiring are colored
and numbered.  Always check the
numbers on the wiring to the unit
terminal block against that in the wiring
diagram. Should there be any
inconsistency, please do not hesitate to
contact the nearest Trane Sales &
Service Office.

Safety Controls

Safety controls for the WCVS water-
cooled packaged units are indicated
in Table 2.  Please note that the high-
low pressure cut-outs are non-
adjustable, factory pre-set switches.

WARNING: PHASE ROTATION FOR
SCROLL COMPRESSORS IS
CRITICAL.
PLEASE ENSURE THAT WIRING TO
THE COMPRESSOR TERMINALS ARE
CONNECTED IN THE CORRECT
PHASE SEQUENCES.  PLEASE
REFER DIAGRAM ON FIGURE 6.

Figure 6 

-Scroll Compressors

Terminal Wiring

LINE 1 & 2 TO BE CONNECTED IN
SERIES WITH CONTROL.

Phase Sequencing

The scroll compressor is an
unidirectional compressor and to
function properly it must be phase
properly.  The Compressor data sheets
show the correct phasing for the
compressor.  The scroll compressor
will run without damaging itself if the
phasing is improper, but it will not pump
refrigerant and will draw minimal
current.  if the compressor is incorrectly
phased upon start up, it will eventually
shutoff on the internal winding
thermostat.  Depending on the
conditions it could take up to 30 minutes
to trip the internal winding thermostats.
The compressor will be noisy, vibrate
excessively and the oil sump will
become warm when running
backwards.

It is important that the proper rotation
of the scroll compressor be established
before the compressor is started.
Proper motor rotation requires
confirmation of the electrical phase
sequencing of the power supply.  To
confirm the correct phase sequence
(ABC), use a device similar of the Model
45 Associated Research Phase
indicator as shown in Figure 7.

Figure 7

- Model 45 Associated

Research Phase Indicator

WARNING: The supply to the unit
must be properly grounded.
Disconnect electrical power source
when power supply wirings are
installed.  Failure to do so may result
in injury or death from electric shock.

PHASING TO BE CONNECTED AS
SHOWNTO PREVENT REVERSE
ROTATION.

-

Содержание WCVS 12H

Страница 1: ...ion Operation Maintenance Self Contained Water Cooled Air Conditioners WCVS SVX01A EN Aug 2012 Models WCVS 270 WCVS 330 WCVS 400 WCVS 470 WCVS 530 WCVS 600 WCVS 660 WCVS 730 WCVS 800 WCVS 900 WCVS 12H...

Страница 2: ......

Страница 3: ...he shipment Take photos of the damage material if possible Notify the carrier immediately by phone and registered mail Notify the local Trane Sales Office Concealed damage must be reported within 15 d...

Страница 4: ...al Specification General Information Installation Operation Start up Coil Condenser Cleaning Trouble Analysis Guide Electrical Data Electrical Wiring Unit Dimensions Wiring Diagram Schematic Wiring Di...

Страница 5: ...ory Minor Design Sequence C Double Wall PU Panels Standard on all models Introduction of FUJI Starter Factory Installed Options X None Installed Motor kW Refrigerent Type A R22 B R407c Future Use Serv...

Страница 6: ...TRANE General Specification WCVS 270 12H 2...

Страница 7: ...TRANE 3...

Страница 8: ...e unit weights may be unevenly distributed Unit weights are provided in the general specification WARNING To prevent injury or death and unit damage observe handling cautions and procedures given in F...

Страница 9: ...all a condenser main and standby water pump cooling tower pressure gauges strainers and all components for waterside piping All field installed piping must conform to applicable local codes Recommende...

Страница 10: ...M Water Pressure Drop Ft H20 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 5 0 Water Pressure Drop Psi 96 96 96 Condenser 35 T Pressure Drop Vs GPM 2 31 3 31 4 31 5 31 6 31 7 31 8 31 9 31 10 31 11 31 12 31 13 3...

Страница 11: ...60 70 80 90 100 110 120 130 140 150 160 170 180 GPM Water Pressure Drop Ft H20 0 1 0 6 1 1 1 6 2 1 2 6 3 1 3 6 4 1 4 6 5 1 5 6 Water Pressure Drop PSIG 96 96 96 96 Condenser Pressure Drop Vs GPM WCVS...

Страница 12: ...n the Zone Sensor Thumbwheel to desired temperature setting Operation Unit start stop controls are provided on the facia of the unit mounted control box Unit is operated by pressing the START botton w...

Страница 13: ...hould be checked and adjusted at least twice during the first few days of new belt operation Weekly maintenance Six month interval Required Unit Service Envelope The following summarizes the envelope...

Страница 14: ...ype NFPA 90A and Residence Type Warm Air Heating and Air Conditioning Systems NFPA 90B or as perapplicable local codes Make duct connections to the unit with a flexible material such as heavy canvas I...

Страница 15: ...TRANE Operation Start Up 11 Figure 4 Fan Duct Layout Comment Figure 5 A A A A R 6o minimum A A...

Страница 16: ...d be provided or approved by the chemical supply house Caution Do not clean the refrigerant coil with hot water or steam The use of hot water or steam as a refrigerant coil cleaning agent will cause h...

Страница 17: ...enser If condenser in changed Air in system Moisture in system Bad compressor Service valve closed if any Recover Re evacuate Re charge Recover Re evacuate Re charge or add refring Remove restriction...

Страница 18: ...380 415V 3Ph 50Hz Over Size Fan Mtr 380 415V 3Ph 50Hz Over Size Fan Mtr 380 415V 3Ph 50Hz Over Size Fan Mtr 380 415V 3Ph 50Hz Over Size Fan Mtr 380 415V 3Ph 50Hz 380 415V 3Ph 50Hz Compr 1 Compr 2 Com...

Страница 19: ...WIRING TO THE COMPRESSOR TERMINALS ARE CONNECTED IN THE CORRECT PHASE SEQUENCES PLEASE REFER DIAGRAM ON FIGURE 6 Figure 6 Scroll Compressors Terminal Wiring LINE 1 2 TO BE CONNECTED IN SERIES WITH CON...

Страница 20: ...TRANE Unit Dimensions Water Cooled Vertical System WCVS 270 330 16...

Страница 21: ...TRANE Unit Dimensions Water Cooled Vertical System WCVS 400 470 17...

Страница 22: ...TRANE Unit Dimensions Water Cooled Vertical System WCVS 530 600 660 18...

Страница 23: ...TRANE Unit Dimensions Water Cooled Vertical System WCVS 730 800 19...

Страница 24: ...TRANE Unit Dimensions Water Cooled Vertical System WCVS 900 12H 20...

Страница 25: ...TRANE Wiring Diagram With Starter WCVS 270 330 21...

Страница 26: ...TRANE Schematic Wiring Diagram With Starter WCVS 400 22...

Страница 27: ...TRANE Schematic Wiring Diagram With Starter WCVS 470 530 23...

Страница 28: ...TRANE Schematic Wiring Diagram With Starter WCVS 600 660 730 800 24...

Страница 29: ...TRANE Schematic Wiring Diagram With Starter WCVS 900 25...

Страница 30: ...TRANE Schematic Wiring Diagram With Starter WCVS 12H 26...

Страница 31: ......

Страница 32: ...t office WCVS SVX01A EN August 2012 WCVS SVX01A EN February 2009 MALAYSIA R Trane has a policy of continuous product and product data improvement and reserves the right to change design and specificat...

Отзывы: