background image

TRANE

®

Foreword

These instructions do not attempt to
cover all variations in system, nor to
provide for every possible contingency
to be met in connection with installation.
Should further information be desired
or should particular problems arise
which are not sufficiently covered for the
purchaser’s purpose, the matter
should be referred to the manufacturer.

Warranty

Warranty is based on the general terms
and conditions of Trane-Ingersoll
Rand.  The warranty is void if the
equipment is repaired or modified
without the written approval of the
manufacturer, if the operating limits are
exceeded or if the control system or
the electrical wiring is modified.
Damage due to misuse, lack of
maintenance or failure to comply with
the manufacturer

s instructions or

recommendations is not covered by the
warranty obligation.

Reception

On arrival, inspect the unit before
signing the delivery note.  Specify any
damage on the delivery note, and send
a registered letter of protest to the last
carrier of the goods within 72 hours of
delivery.  Notify the local Trane Sales
Office at the same time.

The unit should be totally inspected
within 15 days of delivery.  If any
concealed damage is discovered, stop
unpacking the shipment.

Take photos of the damage material if
possible. Notify the carrier immediately
by phone and registered mail.  Notify
the local Trane Sales Office.
Concealed damage must be reported
within 15 days of delivery.

Check the unit nameplate to confirm
that the proper unit was shipped.
Available power supply must be
compatible with electrical characteristics
specified on component nameplates.

General Information

This manual covers the installation,
operation and maintenance of the Trane
WCVS.

Note:

Warnings

 and 

Cautions

 appear at

appropriate places in this manual.  Your
personal safety and the proper
operation of this machine require that
you follow them carefully. The
manufacturer assumes no liability for
installations or servicing performed by
unqualified personnel.

Handling

The unit will be supplied with a
shipping base and protective
packaging over the unit casing.  The
packaging should be kept on the unit

during handling or storage on site.

lf it is necessary to remove the packaging

for inspection prior to completion of on

site handling, retain packaging parts

and reapply them by tapping in position

Performance Data

to prevent damage to the casing. The

unit as supplied has a shipping base

which is suitable for handling by a fork

lift truck. If it is necessary to sling the

unit, use spreader bars under the

shipping base. Ensure that ropes do

not cause abrasion to the surface of

the unit.

(i)

Содержание WCVS 12H

Страница 1: ...ion Operation Maintenance Self Contained Water Cooled Air Conditioners WCVS SVX01A EN Aug 2012 Models WCVS 270 WCVS 330 WCVS 400 WCVS 470 WCVS 530 WCVS 600 WCVS 660 WCVS 730 WCVS 800 WCVS 900 WCVS 12H...

Страница 2: ......

Страница 3: ...he shipment Take photos of the damage material if possible Notify the carrier immediately by phone and registered mail Notify the local Trane Sales Office Concealed damage must be reported within 15 d...

Страница 4: ...al Specification General Information Installation Operation Start up Coil Condenser Cleaning Trouble Analysis Guide Electrical Data Electrical Wiring Unit Dimensions Wiring Diagram Schematic Wiring Di...

Страница 5: ...ory Minor Design Sequence C Double Wall PU Panels Standard on all models Introduction of FUJI Starter Factory Installed Options X None Installed Motor kW Refrigerent Type A R22 B R407c Future Use Serv...

Страница 6: ...TRANE General Specification WCVS 270 12H 2...

Страница 7: ...TRANE 3...

Страница 8: ...e unit weights may be unevenly distributed Unit weights are provided in the general specification WARNING To prevent injury or death and unit damage observe handling cautions and procedures given in F...

Страница 9: ...all a condenser main and standby water pump cooling tower pressure gauges strainers and all components for waterside piping All field installed piping must conform to applicable local codes Recommende...

Страница 10: ...M Water Pressure Drop Ft H20 0 5 1 0 1 5 2 0 2 5 3 0 3 5 4 0 4 5 5 0 Water Pressure Drop Psi 96 96 96 Condenser 35 T Pressure Drop Vs GPM 2 31 3 31 4 31 5 31 6 31 7 31 8 31 9 31 10 31 11 31 12 31 13 3...

Страница 11: ...60 70 80 90 100 110 120 130 140 150 160 170 180 GPM Water Pressure Drop Ft H20 0 1 0 6 1 1 1 6 2 1 2 6 3 1 3 6 4 1 4 6 5 1 5 6 Water Pressure Drop PSIG 96 96 96 96 Condenser Pressure Drop Vs GPM WCVS...

Страница 12: ...n the Zone Sensor Thumbwheel to desired temperature setting Operation Unit start stop controls are provided on the facia of the unit mounted control box Unit is operated by pressing the START botton w...

Страница 13: ...hould be checked and adjusted at least twice during the first few days of new belt operation Weekly maintenance Six month interval Required Unit Service Envelope The following summarizes the envelope...

Страница 14: ...ype NFPA 90A and Residence Type Warm Air Heating and Air Conditioning Systems NFPA 90B or as perapplicable local codes Make duct connections to the unit with a flexible material such as heavy canvas I...

Страница 15: ...TRANE Operation Start Up 11 Figure 4 Fan Duct Layout Comment Figure 5 A A A A R 6o minimum A A...

Страница 16: ...d be provided or approved by the chemical supply house Caution Do not clean the refrigerant coil with hot water or steam The use of hot water or steam as a refrigerant coil cleaning agent will cause h...

Страница 17: ...enser If condenser in changed Air in system Moisture in system Bad compressor Service valve closed if any Recover Re evacuate Re charge Recover Re evacuate Re charge or add refring Remove restriction...

Страница 18: ...380 415V 3Ph 50Hz Over Size Fan Mtr 380 415V 3Ph 50Hz Over Size Fan Mtr 380 415V 3Ph 50Hz Over Size Fan Mtr 380 415V 3Ph 50Hz Over Size Fan Mtr 380 415V 3Ph 50Hz 380 415V 3Ph 50Hz Compr 1 Compr 2 Com...

Страница 19: ...WIRING TO THE COMPRESSOR TERMINALS ARE CONNECTED IN THE CORRECT PHASE SEQUENCES PLEASE REFER DIAGRAM ON FIGURE 6 Figure 6 Scroll Compressors Terminal Wiring LINE 1 2 TO BE CONNECTED IN SERIES WITH CON...

Страница 20: ...TRANE Unit Dimensions Water Cooled Vertical System WCVS 270 330 16...

Страница 21: ...TRANE Unit Dimensions Water Cooled Vertical System WCVS 400 470 17...

Страница 22: ...TRANE Unit Dimensions Water Cooled Vertical System WCVS 530 600 660 18...

Страница 23: ...TRANE Unit Dimensions Water Cooled Vertical System WCVS 730 800 19...

Страница 24: ...TRANE Unit Dimensions Water Cooled Vertical System WCVS 900 12H 20...

Страница 25: ...TRANE Wiring Diagram With Starter WCVS 270 330 21...

Страница 26: ...TRANE Schematic Wiring Diagram With Starter WCVS 400 22...

Страница 27: ...TRANE Schematic Wiring Diagram With Starter WCVS 470 530 23...

Страница 28: ...TRANE Schematic Wiring Diagram With Starter WCVS 600 660 730 800 24...

Страница 29: ...TRANE Schematic Wiring Diagram With Starter WCVS 900 25...

Страница 30: ...TRANE Schematic Wiring Diagram With Starter WCVS 12H 26...

Страница 31: ......

Страница 32: ...t office WCVS SVX01A EN August 2012 WCVS SVX01A EN February 2009 MALAYSIA R Trane has a policy of continuous product and product data improvement and reserves the right to change design and specificat...

Отзывы: