66
RT-SVX34R-EN
Preparing the Unit for Operation
Be sure to complete all of the procedures described in
this section before starting the unit for the first time.
Use the checklist provided below in conjunction with
the “Installation Checklist” to ensure that the unit is
properly installed and ready for operation.
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
do
ou
uss V
Vo
olltta
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o d
diisscco
on
nn
ne
ecctt p
po
ow
we
err b
be
effo
orre
e sse
errv
viicciin
ng
g cco
ou
ulld
d
rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
D
Diisscco
on
nn
ne
ecctt a
allll e
elle
eccttrriicc p
po
ow
we
err,, iin
nccllu
ud
diin
ng
g rre
em
mo
otte
e
d
diisscco
on
nn
ne
eccttss b
be
effo
orre
e sse
errv
viicciin
ng
g.. F
Fo
ollllo
ow
w p
prro
op
pe
err
llo
occkko
ou
utt//tta
ag
go
ou
utt p
prro
occe
ed
du
urre
ess tto
o e
en
nssu
urre
e tth
he
e p
po
ow
we
err
cca
an
n n
no
ott b
be
e iin
na
ad
dv
ve
errtte
en
nttlly
y e
en
ne
errg
giizze
ed
d.. V
Ve
erriiffy
y tth
ha
att n
no
o
p
po
ow
we
err iiss p
prre
esse
en
ntt w
wiitth
h a
a v
vo
ollttm
me
ette
err..
•
Check all electrical connections for tightness and
“point of termination” accuracy.
•
Verify that the condenser airflow will be
unobstructed.
•
Check the compressor crankcase oil level. Oil
should be visible in the compressor oil sight glass.
The oil level may be above the sight glass prior to
the initial start. Use appropriate lighting (flashlight)
to verify the presence of oil.
•
Prior to unit startup allow the crankcase heater to
operate a minimum of 8 hours to remove liquid
refrigerant from the compressor sump.
•
Optional Service Valves - Verify that the discharge
service valve and suction service valve fully open
on each circuit.
N
No
otte
e:: High Efficiency units come standard with
discharge service valves.
•
Check the supply fan belts for proper tension and
the fan bearings for sufficient lubrication. If the
belts require adjustment, or if the bearings need
lubricating, refer to the Maintenance section of this
manual for instructions.
•
Inspect the interior of the unit for tools and debris
and install all panels in preparation for starting the
unit.
Electrical Phasing
Unlike traditional reciprocating compressors, scroll
compressors are phase sensitive. Proper phasing of the
electrical supply to the unit is critical for proper
operation and reliability.
The compressor motor is internally connected for
clockwise rotation with the incoming power supply
phased as A, B, C. Proper electrical supply phasing can
be quickly determined and corrected before starting the
unit by using an instrument such as an Ideal - Sperry
61-520 Phase Sequence Indicator and following the
steps below:
W
WA
AR
RN
NIIN
NG
G
H
Ha
azza
arrd
do
ou
uss V
Vo
olltta
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o d
diisscco
on
nn
ne
ecctt p
po
ow
we
err b
be
effo
orre
e sse
errv
viicciin
ng
g cco
ou
ulld
d
rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
D
Diisscco
on
nn
ne
ecctt a
allll e
elle
eccttrriicc p
po
ow
we
err,, iin
nccllu
ud
diin
ng
g rre
em
mo
otte
e
d
diisscco
on
nn
ne
eccttss b
be
effo
orre
e sse
errv
viicciin
ng
g.. F
Fo
ollllo
ow
w p
prro
op
pe
err
llo
occkko
ou
utt//tta
ag
go
ou
utt p
prro
occe
ed
du
urre
ess tto
o e
en
nssu
urre
e tth
he
e p
po
ow
we
err
cca
an
n n
no
ott b
be
e iin
na
ad
dv
ve
errtte
en
nttlly
y e
en
ne
errg
giizze
ed
d.. V
Ve
erriiffy
y tth
ha
att n
no
o
p
po
ow
we
err iiss p
prre
esse
en
ntt w
wiitth
h a
a v
vo
ollttm
me
ette
err..
•
Open the disconnect switch or circuit protector
switch that provides the supply power to the unit's
power terminal block or to the unit mounted
disconnect switch.
•
To be consistent with the compressor leads,
connect the phase sequence indicator leads to the
terminal block or unit mounted disconnect switch
as follows;
Table 40.
Phase sequence leads
Phase Sequence Leads
Unit Power Terminal
Red (phase A)
L1
Blue (phase B)
L2
Black (Phase C)
L3
•
Turn the “System” selection switch to the “Off”
position and the “Fan” selection switch (if
Applicable) to the “Auto” position.
•
Close the disconnect switch or circuit protector
switch that provides the supply power to the unit's
power terminal block or unit mounted disconnect
switch.
W
WA
AR
RN
NIIN
NG
G
L
Liiv
ve
e E
Elle
eccttrriicca
all C
Co
om
mp
po
on
ne
en
nttss!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w a
allll e
elle
eccttrriicca
all ssa
affe
etty
y p
prre
ecca
au
uttiio
on
nss
w
wh
he
en
n e
ex
xp
po
osse
ed
d tto
o lliiv
ve
e e
elle
eccttrriicca
all cco
om
mp
po
on
ne
en
nttss cco
ou
ulld
d
rre
essu
ulltt iin
n d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
W
Wh
he
en
n iitt iiss n
ne
ecce
essssa
arry
y tto
o w
wo
orrkk w
wiitth
h lliiv
ve
e e
elle
eccttrriicca
all
cco
om
mp
po
on
ne
en
nttss,, h
ha
av
ve
e a
a q
qu
ua
alliiffiie
ed
d lliicce
en
nsse
ed
d e
elle
eccttrriicciia
an
n
o
orr o
otth
he
err iin
nd
diiv
viid
du
ua
all w
wh
ho
o h
ha
ass b
be
ee
en
n p
prro
op
pe
errlly
y ttrra
aiin
ne
ed
d
iin
n h
ha
an
nd
dlliin
ng
g lliiv
ve
e e
elle
eccttrriicca
all cco
om
mp
po
on
ne
en
nttss p
pe
errffo
orrm
m
tth
he
esse
e tta
asskkss..
HIGH VOLTAGE IS PRESENT AT TERMINAL BLOCK
HTB1 OR UNIT DISCONNECT SWITCH.
•
Observe the ABC and CBA phase indicator lights on
the face of the sequencer. The ABC indicator light
will glow if the phase is ABC. If the CBA indicator
light glows, open the disconnect switch or circuit
protection switch and reverse any two power wires.
•
Restore main electrical power and recheck phasing.
If the phasing is correct, open the disconnect switch
or circuit protection switch and remove the phase
sequence indicator.
Содержание Voyager Commercial
Страница 153: ...RT SVX34R EN 153 N No ot te es s...
Страница 154: ...154 RT SVX34R EN N No ot te es s...
Страница 155: ...RT SVX34R EN 155 N No ot te es s...