10
UNT-SVX07A-EN
Installation
dimensions
& weights
Vertical Concealed Unit Dimensions & weights, in-lbs.
Unit
Size
02-03
04
06
08
10-12
A
2’-8
11
/
16
” 3’-1
11
/
16
”
3’-11
3
/
16
” 4’-7
11
/
16
” 6’-2
11
/
16
”
B
1’-9
5
/
16
”
2’-2
5
/
16
”
2’-11
13
/
16
” 3’-8
5
/
16
” 5’-3
5
/
16
”
C
1’-10
13
/
16
” 2’-3
13
/
16
”
3’-1
5
/
16
”
3’-9
13
/
16
” 5’-4
13
/
16
”
D
1’-5
5
/
16
” 1’-10
5
/
16
”
2’-7
13
/
16
” 3’-4
5
/
16
” 4’-11
5
/
16
”
E
1’-7
5
/
16
”
2’-0
5
/
16
”
2’-9
13
/
16
” 3’-6
5
/
16
” 5’-1
5
/
16
”
operating weight
81
109
139
147
200
shipping weight
68
96
123
131
182
Notes:
1. Coil connections are always on the drain pan side and opposite the control
box.
2. Coil connections are
5
/
8
” O.D. sweat. See pages 21-22 for locations.
3. All duct collar dimensions are to the outside of the collar.
4. See fresh air opening dimensions on pages 23-24.
Vertical Concealed, Model A
Содержание UniTrane FC
Страница 71: ...UNT SVX07A EN 71 typical wiring diagram Maintenance CSTI Fan Speed Switch...
Страница 72: ...72 UNT SVX07A EN typical wiring diagram Maintenance CSTI Non Fan Speed Switch...
Страница 73: ...UNT SVX07A EN 73 typical wiring diagram Maintenance Line voltage fan speed switch...
Страница 74: ...74 UNT SVX07A EN typical wiring diagram Maintenance Tracer ZN010 with electric heat...
Страница 75: ...UNT SVX07A EN 75 typical wiring diagram Maintenance Tracer ZN510 with main and auxilliary valves...
Страница 76: ...76 UNT SVX07A EN typical wiring diagram Maintenance ZN520 with 2 stage electric heat...
Страница 77: ......
Страница 78: ......
Страница 79: ......