Installation Checklist

Reference the checklist below to verify all
steps required to successfully install a
deluxe self-contained unit are complete.
This checklist is intended to acquaint the
installing personnel with what is required
in the installation process. It does not
replace the detailed instructions detailed
in the applicable sections of this manual.

 

WARNING

Hazardous voltage!

D

isconnect all

 electric power, including

remote

 disconnects before servicing.

F

ollow proper lockout/

tagout procedures

to ensure 

the 

power

 can not be

inadvertently energized.

 Failure to

disconnect power before

 servicing

could

 

result in

 death or serious

injury

.

General Unit Requirements

†

Install and secure the ductwork to the

unit.

†

Check unit for shipping damage and

material shortage. Refer to the
Receiving Checklist.

Electrical Requirements

†

Verify that the electrical power supply

characteristics comply with the unit
nameplate specifications.

†

Inspect all control components; tighten

any loose connections.

†

Connect properly sized and protected

power supply wiring to a field supplied/
installed disconnect and unit power
terminal block, or to the optional unit
mounted disconnect switch.

†

Properly ground the unit.

Field Installed Control Wiring (Optional)

†

Complete the field wiring connections.

Note: All field installed wiring must
comply with NEC and applicable local
codes.

Fan Discharge Conversion

Complete the steps below to convert the
fan discharge from vertical to horizontal.

1. Remove all mid and top fan section

panels.

2. Loosen the brackets inside the unit that

clamp the mid and fan sections
together.

3. Remove the control box cover and

disconnect the motor power wires.
Feed wires up through the unit and
secure out of the way until rotation is
complete.

4. Rotate the fan section to desired

position.

5. Re-route the motor power wires back

to the control box. Ensure all wiring is
free and not routed over any sharp
edges.

6. Reconnect the motor power wires per

the unit wiring diagram.

7. Bolt and/or clamp all brackets back into

place.

8. Replace control box cover and all

exterior panels.

9. Verify the fan rotation and motor amp

draw.

Plenum Installation

1. Uncrate the plenum and accessory

bag.

2. Rotate the evaporator blower to the

vertical discharge configuration.

3. Apply the soft gasket provided around

the aluminum frame on top of the unit
as shown in Figure I-IP-1.

4. Using a screwdriver, tighten the self-

drilling screws as shown in Figure I-IP-
1. Be sure to tighten all screws on the
rear, right, and left sides through the
pilot holes on the plenum panels.

5. When installation is complete, adjust

the motor pulley and the discharge
grille for proper airflow.

installation
procedure

Installation

Figure I-IP-1. Plenum installation

Содержание SCRH

Страница 1: ...PKG SVX14A EN Installation Operation and Maintenance Midrange Self Contained Units October 2008 Models SCWH SCRH 3 5 7 5 10 12 15 tons AO and later design sequence...

Страница 2: ...ous Voltage Disconnect all electric power including remote disconnects before servicing Follow proper lockout tagout procedures to ensure power cannot be inadvertently energized Failure to disconnect...

Страница 3: ...tion 2 pre installation considerations 6 dimensions weights 11 mechanical requirements 17 electrical requirements 19 installation procedure 21 pre startup requirements 22 startup 23 Operation 24 seque...

Страница 4: ...igit 8 unit voltage 3 208 230 volt 60 hz 3 ph 4 460 volt 60 hz 3 ph 5 575 volt 60 hz 3 ph Digit 9 air flow configuration 2 vertical discharge front return 3 vertical discharge rear return Digit 10 11...

Страница 5: ...efrigerant quality standards are addressed in ARI Standard 700 Refrigerant Handling and Safety Consult the manufacturer s material safety data sheet MSDS for information on refrigerant handling to ful...

Страница 6: ...hin the allotted time after delivery Check with the carrier for their allotted time to submit a claim Do not move damaged material from the receiving location It is the receiver s responsibility to pr...

Страница 7: ...MPRESSOR ACCESS 42 SERVICE CLEARANCE FRONT DRAIN CONNECTION AIR FILTER ACCESS BOTH SIDES BOTH SIDES 26 SERVICE CLEARANCE LEFT SIDE SIGHT GLASS FILTER DRIER ACCESS RIGHT SIDE 24 26 SERVICE CLEARANCE LE...

Страница 8: ...8 PKG SVX14A EN Installation pre installation considerations Service Access 10 12 15 ton SCWH SRCH with side mounted fan configura tion field converted 10 through 15 ton SCRH SCWH...

Страница 9: ...r cooled models water cooled models L1 L2 L3 L4 L1 L2 L3 L4 10 tonunit 318 150 363 169 383 211 383 211 spring red yellow red yellow red yellow red yellow rubber in shear green red green red green red...

Страница 10: ...ase Protect the unit from damage by rigging equipment WARNING Improper Unit Lift Test lift unit approximately 24 inches high to verify the proper center of gravity lift point To avoid dropping the uni...

Страница 11: ...erted SCWH SCRH dimensions weight in lbs unit shipping operating size A B C D E F G J K L M N O P Q R S weight weight 3 31 89 64 17 22 24 5 65 11 93 14 31 10 63 18 00 7 80 7 80 15 60 15 63 20 20 6 28...

Страница 12: ...KG SVX14A EN dimensions weights 7 5 tons SCWH SCRH Installation SCWH vertical discharge horizontal discharge field converted SCWH SCRHweight lbs unit shipping operating size weight weight 7 5 702 657...

Страница 13: ...vertical discharge SCRH SCWH SCWH SCRH dimensions weight in lbs unit shipping operating tons A B C D E F G J K M N weight weight 10 66 75 88 78 7 04 18 07 57 28 19 01 25 0 5 23 7 48 5 8 8 30 984 917 1...

Страница 14: ...7 04 18 07 57 28 66 93 25 79 12 65 75 7 04 18 07 61 22 66 93 29 73 15 80 31 19 83 19 83 61 22 81 49 29 73 Notes 1 Base rail must be attached to the floor before converting unit to side mounted fan co...

Страница 15: ...ton 65 75 29 52 120 15 ton 80 31 29 52 146 A B C D E F G 0 39 0 28 1 38 1 38 5 91 1 57 3 15 0 39 0 59 0 59 2 18 2 18 8 39 1 03 1 03 1 08 0 75 0 75 5 9 1 0 NPT Hot water coil 3 5 ton units SCWH SCRH H...

Страница 16: ...LED Hot water coil 10 thru 15 ton units 35 51 28 03 5 91 0 43 1 57 3 15 34 72 0 39 0 75 0 75 0 39 5 9 1 0 NPT 0 75 17 00 0 75 2 22 2 22 16 25 20 7 0 39 1 87 8 48 8 48 14 64 1 55 1 55 3 03 0 39 1 87 1...

Страница 17: ...1 Remove back panel to access the water connection fittings 2 Attach the water supply line to the inlet connection and the return line to the outlet connection The water connection fittings are copper...

Страница 18: ...ly to the joint Excess flux will contaminate the refrigerant system 6 Apply heat evenly over the length and circumference of the joint making sure the entire joint becomes hot enough to melt the brazi...

Страница 19: ...e voltage at the compressor terminals to determine if it is balanced Voltage imbalance on three phase systems can cause motor overheating and premature failure The maximum allowable imbalance is 2 0 V...

Страница 20: ...460V 60Hz 3Ph 13 6 100 0 4 60 35 2 45 6 18 36 8 50 SC H1505 575V 60Hz 3Ph 10 9 78 0 3 40 27 9 35 4 94 29 5 35 12 2 tons MFS MCB model voltage compressor evap fan motor min circuit ampacity 10 2 2 1 2...

Страница 21: ...field wiring connections Note All field installed wiring must comply with NEC and applicable local codes Fan Discharge Conversion Complete the steps below to convert the fan discharge from vertical t...

Страница 22: ...ements Check unit for missing material Look for ship with accessories that are packaged separately and placed inside the access panel fan section or compressor section See the Receiving and Handling s...

Страница 23: ...n and check for unusual noise vibration belt and fan clearances WARNING Hazardous voltage Disconnect all electric power including remote disconnects before servicing Follow proper lockout tagout proce...

Страница 24: ...ects power from the thermostat contacts that control the condensing unit This prevents the condensing unit from running regardless of the thermostat tempera ture setting The evaporator fan may circula...

Страница 25: ...83 indoor coil 3 8 tube size face area sq ft 3 19 4 98 7 13 12 12 12 12 14 56 rows fpf 4 144 4 144 3 168 2 168 2 168 3 168 water condenser tube tube water connection in 3 4 NPT 3 4 NPT 3 4 NPT 1 1 4 N...

Страница 26: ...rsonal safety refer to the cleaning agent manufacturer s materials safety data sheet and follow all recommended safe handling practices Failure to follow all safety instructions could result in death...

Страница 27: ...ecovering and condensing refrigerant into containment When leak checking with trace refrigerant and nitrogen use HCFC22 R22 rather than CFC12 R12 or any other fully halogenated refrigerants Be aware o...

Страница 28: ...rkover may cause damage to the motor windings WARNING Hazardous Pressures If a heat source is required to raise the tank pressure during removal of refrigerant from cylinders use only warm water or he...

Страница 29: ...hly if the unit is in a coastal or corrosive environment Annual Maintenance Check and tighten all set screws bolts locking collars and sheaves 1 Inspect clean and tighten all electrical connections 2...

Страница 30: ...quired Remedy 1 Check power supply for voltage outside the acceptable voltage range 2 Check the control unit for loose wires Firm any loose connections 3 Replace 4 Check for loose wire connection brok...

Страница 31: ...t run Possible cause 1 Faulty switch 2 Open fan motor coil circuit 3 Fan binding on shroud or venturi ring Remedy 1 Correct as follows a clean b defrost using fan operation only c clean or replace fil...

Страница 32: ...32 PKG SVX14A EN typical wiring diagram Maintenance...

Страница 33: ...PKG SVX01A EN 33 typical wiring diagram Maintenance...

Страница 34: ...34 PKG SVX14A EN typical wiring diagram Maintenance...

Страница 35: ...PKG SVX01A EN 35 typical wiring diagram Maintenance...

Страница 36: ...e mail us at comfort trane com Literature Order Number Date Supersedes Trane has a policy of continuous product and product data improvement and reserves the right to change design and specifications...

Отзывы: