
2
About The Manual
Literature Change History
RAUC-IOM-15 (March 2006)
Manual reissued due to minor corrections: Provides Instal-
lation, Operation, and Maintenance instructions for “L” and
later design sequence on RAUC 80 through 120 Ton air
cooled condensing units and the EVP chiller Models used
with these units.
RAUC-IOM-15 (December 2001)
First issue of manual; provides Installation, Operation, and
Maintenance instructions for “L” and later design sequence
on RAUC 80 through 120 Ton air cooled condensing units
and the EVP chiller Models used with these units.
Overview of Manual
Note: One copy of this document ships inside the
control panel of each unit and is customer
property. It must be retained by the unit's
maintenance personnel.
This booklet describes proper installation, operation, and
maintenance procedures for air cooled systems. By care-
fully reviewing the information within this manual and follow-
ing the instructions, the risk of improper operation and/or
component damage will be minimized.
It is important that periodic maintenance be performed to
help assure trouble free operation. A maintenance schedule
is provided at the end of this manual. Should equipment
failure occur, contact a qualified service organization with
qualified, experienced HVAC technicians to properly diag-
nose and repair this equipment.
Note: The procedures discussed in this manual
should only be performed by qualified, experienced
HVAC technicians. Do Not release refrigerant to the
atmosphere! If adding or removing refrigerant is
required, the service technician must comply with
all federal, state, and local laws.
Содержание RAUC-IOM-15
Страница 8: ...8 Figure 3 2A RAUC C80 Unit Dimensional Data Recommended Clearances...
Страница 9: ...9 Figure 3 2A Continued RAUC D10 Unit Dimensional Data Recommended Clearances...
Страница 10: ...10 Figure 3 2A Continued RAUC D12 Unit Dimensional Data Recommended Clearances...
Страница 11: ...11 Figure 3 2B EVPB C80 Evaporator Chiller Dimensions...
Страница 12: ...12 Figure 3 2B Continued EVPB D10 Evaporator Chiller Dimensions...
Страница 13: ...13 Figure 3 2B Continued EVPB D12 Evaporator Chiller Dimensions...
Страница 14: ...14 Figure 3 2B Continued EVPB C80 through D12 Chill Water Pipe Stubout Dimensions...
Страница 35: ...35 Installation Continued Field Connection Diagram Notes for all System Control Options...
Страница 57: ...57 Figure 5 5 Typical Scroll Compressor Terminal Block System Start Up Continued...
Страница 67: ...67...
Страница 68: ...68...