60
System Start-Up (Continued)
Table 5-9
Recommended Operating Setpoints
Control
Control Setting
Recommended Setting
Discharge Air
Supply Air
Set at design discharge (supply)
Controller
Setpoint
air temperature;
(VAV units only)
minimum setting = 55
o
F
Reset
Set at maximum amount of allowable
Setpoint
reset for supply air setpoint.
Control Band
Set at 6
o
F Minimum
Setpoint
Chiller Control
Leaving Fluid
Set at design leaving chilled water
(EVP units only)
Setpoint
temperature.
Design D T
Set at design full load water
Setpoint
D T through evaporator.
Number of Stages
Factory setting - 6 steps
Setpoint
Freeze Protection
35° F (Contact Trane for alternate
Setpoint
settings)
Load Limit
Cut-In = 64° F
Setpoint
Cut-Out = 56° F
Low Pressure
Cut-In = 60 PSIG
Lockout
Cut-Out = 45 PSIG
"No Controls" Units - See System Engineer-
Table 5-10
Sample Maintenance Log
Refrigerant Circuit #1
Refrigerant Circuit #2
Current
Ambient Compr. Suct.
Disch. Liquid Super-
Sub-
Compr. Suct.
Disch. Liquid Super-
Sub-
Temp.
Oil
Press. Press. Press.
heat
cool.
Oil
Press. Press. Press.
heat
cool.
Date
(F)
Level
(Psig)
(Psig)
(Psig)
(F)
(F)
Level
(Psig)
(Psig)
(Psig)
(F)
(F)
- ok
- ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
-
ok -
ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
- ok
- ok
- low
- low
Note: Check and record the data requested above each month during the cooling season with the unit running.
Содержание RAUC-IOM-15
Страница 8: ...8 Figure 3 2A RAUC C80 Unit Dimensional Data Recommended Clearances...
Страница 9: ...9 Figure 3 2A Continued RAUC D10 Unit Dimensional Data Recommended Clearances...
Страница 10: ...10 Figure 3 2A Continued RAUC D12 Unit Dimensional Data Recommended Clearances...
Страница 11: ...11 Figure 3 2B EVPB C80 Evaporator Chiller Dimensions...
Страница 12: ...12 Figure 3 2B Continued EVPB D10 Evaporator Chiller Dimensions...
Страница 13: ...13 Figure 3 2B Continued EVPB D12 Evaporator Chiller Dimensions...
Страница 14: ...14 Figure 3 2B Continued EVPB C80 through D12 Chill Water Pipe Stubout Dimensions...
Страница 35: ...35 Installation Continued Field Connection Diagram Notes for all System Control Options...
Страница 57: ...57 Figure 5 5 Typical Scroll Compressor Terminal Block System Start Up Continued...
Страница 67: ...67...
Страница 68: ...68...