CDHF-SVN01B-EN
50
Electric
Information
Figure 24 - PFCC Leads Routed thru Overload Current Transformer
Figure 25 - Typical Equipment Room Layout for CDHF with Unit-Mounted Starter
Notes:
1. Refer to the unit field connection diagram for approximate UCP knockout
locations.
Important:
To prevent damage to the UCP’s components, do NOT route
control circuit conduit into the top of the UCP enclosure.
2. IPC circuit conduit must enter the left back portion of the UCP.
3. See Starter Submittal drawing for location of incoming wiring to the starter.
PFCC and Unit
Mounted Starter
Содержание Duplex Water-Cooled Hermetic CenTraVac
Страница 10: ...CDHF SVN01B EN 10 Figure 2 Typical CDHF Chiller General Information ...
Страница 38: ...CDHF SVN01B EN 38 Vent Line Piping Figure 20B Continued ...
Страница 39: ...39 CDHF SVN01B EN Vent Line Piping Figure 20C Continued ...
Страница 40: ...CDHF SVN01B EN 40 Vent Line Piping Figure 21 Rupture Disc Vent Pipe Sizing ...
Страница 42: ...CDHF SVN01B EN 42 Figure 22 Recommended Areas for Unit Insulation ...
Страница 59: ...59 CDHF SVN01B EN ...
Страница 60: ...CDHF SVN01B EN 60 ...
Страница 61: ...61 CDHF SVN01B EN ...
Страница 62: ...CDHF SVN01B EN 62 ...
Страница 63: ...63 CDHF SVN01B EN ...
Страница 64: ...CDHF SVN01B EN 64 ...
Страница 65: ...65 CDHF SVN01B EN ...
Страница 66: ...CDHF SVN01B EN 66 ...
Страница 67: ...67 CDHF SVN01B EN ...
Страница 68: ...CDHF SVN01B EN 68 ...
Страница 69: ...69 CDHF SVN01B EN ...
Страница 70: ...CDHF SVN01B EN 70 ...
Страница 71: ...71 CDHF SVN01B EN ...
Страница 72: ...CDHF SVN01B EN 72 ...
Страница 73: ...73 CDHF SVN01B EN ...
Страница 74: ...CDHF SVN01B EN 74 ...
Страница 75: ...75 CDHF SVN01B EN ...
Страница 76: ...CDHF SVN01B EN 76 ...
Страница 77: ...77 CDHF SVN01B EN ...
Страница 78: ...CDHF SVN01B EN 78 ...
Страница 79: ...79 CDHF SVN01B EN ...