CVHH-SVX001G-EN
53
Electrical Requirements
Installation Requirements
W
WA
AR
RN
NIIN
NG
G
P
Prro
op
pe
err F
Fiie
elld
d W
Wiirriin
ng
g a
an
nd
d G
Grro
ou
un
nd
diin
ng
g
R
Re
eq
qu
uiirre
ed
d!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w cco
od
de
e cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y..
A
Allll ffiie
elld
d w
wiirriin
ng
g M
MU
US
ST
T b
be
e p
pe
errffo
orrm
me
ed
d b
by
y q
qu
ua
alliiffiie
ed
d
p
pe
errsso
on
nn
ne
ell.. IIm
mp
prro
op
pe
errlly
y iin
nsstta
alllle
ed
d a
an
nd
d g
grro
ou
un
nd
de
ed
d
ffiie
elld
d w
wiirriin
ng
g p
po
osse
ess F
FIIR
RE
E a
an
nd
d E
EL
LE
EC
CT
TR
RO
OC
CU
UT
TIIO
ON
N
h
ha
azza
arrd
dss.. T
To
o a
av
vo
oiid
d tth
he
esse
e h
ha
azza
arrd
dss,, y
yo
ou
u M
MU
US
ST
T ffo
ollllo
ow
w
rre
eq
qu
uiirre
em
me
en
nttss ffo
orr ffiie
elld
d w
wiirriin
ng
g iin
nsstta
alllla
attiio
on
n a
an
nd
d
g
grro
ou
un
nd
diin
ng
g a
ass d
de
essccrriib
be
ed
d iin
n N
NE
EC
C a
an
nd
d y
yo
ou
urr llo
occa
all//
sstta
atte
e//n
na
attiio
on
na
all e
elle
eccttrriicca
all cco
od
de
ess..
X39003892001A
N
No
otte
e:: Graphic labels (shown above) are used for CE
application only.
IIm
mp
po
orrtta
an
ntt::
•
Before servicing, disconnect all power
sources and allow at least 30 minutes
for capacitors to discharge.
•
All electrical enclosures—unit or remote
—are IP2X.
Unit-mounted starters are available as an option on
most units. While this option eliminates most field-
installed wiring requirements, the electrical contractor
must still complete the electrical connection for the
following:
•
power supply wiring to the starter,
•
other unit control options present, and
•
any field-supplied control devices.
As you review this manual along with the wiring
instructions presented in this section, keep in mind
that:
•
All field-installed wiring must conform to National
Electric Code (NEC) guidelines, and any applicable
local, state, and national codes. For the USA, be
sure to satisfy proper equipment grounding
requirements per NEC.
•
Compressor motor and unit electrical data
(including motor kW, voltage utilization range,
rated load amps, and locked rotor amps) is listed on
the chiller nameplate.
•
All field-installed wiring must be checked for proper
terminations, and for possible shorts or grounds.
N
No
otte
e:: Always refer to the actual wiring diagrams
that shipped with the chiller or the unit
submittal for specific as-built electrical
schematic and connection information.
N
NO
OT
TIIC
CE
E
A
Ad
da
ap
pttiiv
ve
e F
Frre
eq
qu
ue
en
nccy
y D
Drriiv
ve
e ((A
AF
FD
D))//
S
Stta
arrtte
err C
Co
om
mp
po
on
ne
en
ntt D
Da
am
ma
ag
ge
e!!
F
Fa
aiillu
urre
e tto
o rre
em
mo
ov
ve
e d
de
eb
brriiss ffrro
om
m iin
nssiid
de
e tth
he
e A
AF
FD
D//
sstta
arrtte
err p
pa
an
ne
ell cco
ou
ulld
d rre
essu
ulltt iin
n a
an
n e
elle
eccttrriicca
all ssh
ho
orrtt a
an
nd
d
cco
ou
ulld
d cca
au
usse
e sse
erriio
ou
uss A
AF
FD
D//sstta
arrtte
err cco
om
mp
po
on
ne
en
ntt
d
da
am
ma
ag
ge
e..
Do NOT modify or cut enclosure to provide electrical
access. Removable panels have been provided, and
any modification should be done away from the
enclosure. If the starter enclosure must be cut to
provide electrical access, exercise care to prevent
debris from falling inside the enclosure. Refer to
installation information shipped with the starter or
submittal drawings.
Electrical Requirements
Before wiring begins, observe the following electrical
requirements:
•
Follow all lockout/tagout procedures prior to
performing installation and/or service on the unit.
•
Always wear appropriate personal protective
equipment.
•
Wait the required time to allow the capacitor(s) to
discharge; this could be up to 30 minutes.
•
Verify that all capacitors are discharged prior to
service using a properly rated volt meter.
•
Use appropriate capacitor discharge tool when
necessary.
Содержание CVHH CenTraVac
Страница 126: ...126 CVHH SVX001G EN N No ot te es s ...
Страница 127: ...CVHH SVX001G EN 127 N No ot te es s ...