
CLCH-SVX03C-EN
23
Installation - Mechanical
•
Ceiling-suspended unit assembly; see
page 25
.
•
Module-to-module assembly; see
page 26
.
Unit Placement
Refer to the unit submittals and unit tagging for correct placement of all modules. If there are any
discrepancies between the submittals and the unit tagging, contact your local Trane representative
before proceeding.
Following the module order on the unit submittals and tagging, individually place each
unassembled module or subassembly in the appropriate installation location.
WARNING
Heavy Objects!
Always place, assemble, and suspend modules/subassemblies one at a time. Placing,
assembling, and/or suspending more than one module/subassembly at a time may result in
death, serious injury, or equipment damage.
Unit Assembly
Note:
There are no penetrations into the M-Series air handler for any field-provided wiring or
device. Consider overall unit serviceability and accessibility before mounting, running
wires (power), making cabinet penetrations, or mounting any components to the module
cabinet.
See
“Component Installation Requirements” on page 33
for special module assembly/installation
considerations.
Removing the Shipping Skid
To remove the shipping skid after the module/subassembly is in place, remove the leg’s lower lag
bolts, the cross bracing, and the runners.
WARNING
Support Unit
!
Do not use mounting legs for ceiling suspension, external isolation, or unit support during
module placement. Mounting legs are designed only to secure the unit to the floor,
housekeeping pad, or platform. Improper use of the mounting legs as described above could
result in death, serious injury, or equipment damage.