STEP 2 - Remove the pressure tap cap and
valve cores from both service valves.
STEP 3 - Purge the refrigerant lines and indoor
coil with dry nitrogen.
STEP 4 - Wrap a wet rag around the valve
body to avoid heat damage and continue the
dry nitrogen purge.
Braze the refrigerant lines to the service
valves.
Continue the dry nitrogen purge. Do not re-
move the wet rag until all brazing is completed.
Important: Remove the wet rag before stopping
the dry nitrogen purge.
NOTE: Precautions should be taken to avoid
heat damage to basepan during brazing. It is
recommended to keep the flame directly off of
the basepane.