TRAK Machine Tools
Site Preparation Guide
TRAK DPMRX3
F16467-45 Rev 020921
Page 3 of 4
Lifting and/or Moving the Machine
Method 1 (see Figure 1):
1.
Insert a steel bar 1.0" dia x 36" long through the rear
side holes of the bed (under column).
2.
Use a steel cable (with protective covering) min. 3/4" dia.
or a 3 ton sling.
3.
Use cardboard pieces or other suitable protective sheets
on both sides of the machine to prevent scratching.
4.
Remove the 4 nuts and screws holding the machine to the
wood skid.
5.
Lift the machine (the front side of the machine should be
lower than the back side).
6.
Insert the 6 screws for leveling pads in their place in the
bed.
7.
Place the machine in its location (see floor plan and bed
footprint drawing) carefully positioning each leveling pad
under each leveling screw.
8.
Remove the lifting cable or sling, the steel bar and all
protective cardboard.
CAUTION!
The DPMRX3 machine weighs approximately 4100
lbs. Proper equipment of sufficient capacity must
be used when lifting and/or moving the machine.
Figure 1 Lifting the Machine Method 1