4
TRAK Machine Tools
Southwestern Industries, Inc.
32240 - Printer and MMS - Installation & Printing Guide
2.0
3ntr Installation & Training Checklist
This checklist is used by our Field Service Technicians in order to ensure that all installation steps are
completed, and to ensure all in-person training topics are covered.
Day 1
–
Installation
Check
Steps
1.
Site Preparation & Requirements
a.
Verify Floor Plan, Layout & Space Requirements were met
b.
Verify Electrical Requirements were met
i.
Measure between ground on 220v circuit and on ground 110v circuit
= 0v
ii.
Measure between two normal phases = 208v to 240v is okay
iii.
Measure between printer chassis on ground 110v circuit = 0v
iv.
Double check wiring by repeating
c.
Verify PC Requirements were met
2.
Lifting, Moving, Uncrating and Unpacking
a.
Lift and move the printer/MMS near the final location
b.
Uncrate and unpack printer/MMS
c.
Lift and move the printer/MMS after uncrating
3.
Review Packing List & Report any missing items immediately
Write
down Product ID’s for SSI / KS in the Additional Comments Section.
4.
Printer Installation
a.
Review: Orientation, Controls and Functions
b.
Install Spool Holder on the Back of the Printer
c.
Connect the cables & Power ON
d.
Review: LCD Display Overview
e.
Complete a few Operation Checks
–
to verify the printer is functioning
▪
Preheat Print Bed
–
just check the plate heater works
▪
Cooldown
–
to check the fans & cooling system work
▪
Move axis
–
always move Z down before X/Y or you might
damage the plate
▪
Disable Steppers - move print head around
(make sure z has been moved
down first)
▪
Auto-home
–
verify the z sensor arm comes out
Printer Only
Check
Steps
5.
Raspberry Pi
a.
Review: Orientation, Controls and Functions
b.
Connect the cables & Power ON
6.
External HEPA Filter
a.
Review: Orientation, Controls and Functions
b.
Connect the cables & Power ON
c.
Confirm filter placement