background image

14

GB

6. INSPECTION AND MAINTENANCE

NOTE 

: A maintenance program should start for each hoist immediately after it is entered into service. This

maintenance program should comply with recommendations in the applicable parts and Instruction
Manual, and all pertinent Federal, State, Provincial and Local regulations. Regular inspections should be
followed for the life of the hoist and documented by written inspection records.

Use only TRACTEL

®

replacement parts. The replacement of any part with anything other than a TRACTEL

®

authorized replacement

part may adversely affect the function and safety of this hoist and voids the warranty. TRACTEL

®

disclaims liability for any claims of

damages, whether warranty, property damage, personal injury or death arising from the use of unauthorized parts.

6.1 - Load Chain Inspection

tralift™ TE hoist is supplied with a special case hardened load chain, grade 80 or better suited to use on electric chain hoists.

WARNING

After an intensive period of use, the chain may show signs of elongation or wear which could damage the hoist or cause

the chain to break. It is therefore recommended that the lifting chain is inspected regularly. The chain should be measured

and must be replaced if the measurements are greater than those given in the following table.

1) Place the hoist in it’s operating position with the load chain hanging down.

2) Count 11 links (Fig. 19) and mark them.

3) Clean the links with a non-caustic solvent which is neither acidic or caustic (a white spirit type solvent is recommended but

only if it is according to National / Provincial / local environmental regulation ).

4) Measure the 11 links and compare the measurements to Fig. 19.

5) Examine the load chain. The load chain must be replaced if any of the following is found:

• Corroded or cracked links.
• Distorted or twisted links.
• Stretched or particularly worn links.

Do not expose the chain to temperatures greater than 100° C (212° F) or to abuse from mechanical or chemical agents. If so, the load
chain must be replaced. Lightly oil the load chain regularly with SAE 120 type oil or equivalent.

CAUTION

Lubricants must be handled and disposed of according to local, state and federal regulations.

NOTE :

Systematically or repeatedly stopping and starting at the same place will cause more rapid wear of the
links which stop on the load sprocket wheel. If the chain needs to be replaced, this must be performed by
a TRACTEL

®

approved service shop.

ADVANCED LOAD CHAIN INSPECTION

1) Obtain a single link from the load chain to be inspected.

2) Take measurements of p, d4, and d5 (Fig. 22).

3) Calculate dm and d5.

4) Compare the calculations to Fig. 22

WARNING

After an intensive period of use, the chain may show signs of elongation or wear which could damage the hoist or cause

the chain to break. It is therefore recommended that the lifting chain is inspected regularly. The chain should be measured

and must be replaced if the measurements are greater than those given in the following table.

6.2 - Load Chain Replacement

WARNING

Using other than TRACTEL

®

supplied load chain may cause chain to jam in hoist or chain breakage. For proper size and

physical properties use only TRACTEL

®

supplied chain. TRACTEL

®

declines all responsibility for hoists used with chain

supplied by others.

WARNING

When the load chain needs to be replaced, this operation must be performed by a TRACTEL

®

approved repair shop or

qualified technician.

Содержание tralift TE

Страница 1: ...i gno 250 1 500 kg 1 2t 1 fall 1 ci gno 500 1 500 kg 1 2t 2 falls 2 ci gna 500 2 1000 kg 1t 1 fall 1 ci gno 1000 1 1000 kg 1t 2 falls 2 ci gna 1000 2 2000 kg 2t 2 falls 2 ci gna 2000 2 meets or exceed...

Страница 2: ...acity No no 3 Phase Faza 4 Speed Pr dko 5 Nbre of fall Liczba ci gien Fig 1 Fig 2 Fig 4 Fig 5 tralift TE tralift TE Max TE 125 TE 250 TE 500 TE 500 TE 1000 TE 1000 TE 2000 125 250 500 500 1000 1000 20...

Страница 3: ...hook Hak do podnoszenia 4 Load wheel with chain guide Ma e ko o a cuchowe do podnoszenia z prowadnic a cucha 5 Gearbox Reduktor 6 Load hook Hak do podwieszania 7 Chain bag Worek na a cuch 8 Pendant co...

Страница 4: ...10 61 N GB PL RU 1 Running wheels Rolki jezdne 2 Trolley side plates cianki boczne w zka 3 Safety screw ruba zabezpieczaj ca 4 Suspension yoke or axle Oczko lub o do podwieszania PE 1 2 3 4 5 6 7 8 9...

Страница 5: ...0 2000 2000 4000 kg lbs mm inch mm inch p 5 d x p dm 0 9 d d5 1 8 d mm inch mm inch d p 10 A tralift TE tralift TE Max A max A maks A mm inch kg lbs TE 125 125 250 24 0 95 TE 250 250 500 25 3 1 0 TE 5...

Страница 6: ...cedure 4 Electrical connection 11 12 4 1 Caution 4 1 1 Preliminary checks 4 1 2 Electrical connection 4 1 3 Connecting procedure on tralift TE 4 1 4 Connecting procedure on tralift TE with electric dr...

Страница 7: ...2 Safety Standard For Top Running Double Girder Cranes and ANSI ASME B30 11 Safety Standard For Underhung Cranes and Monorails For European versions please see 98 37 CE YOUR DUTY TO INSPECT AND MAINT...

Страница 8: ...components meet the requirements of the applicable safety regulations and are of the proper quality and assembled to form a safe system c every upper support is stable and sufficiently strong accordin...

Страница 9: ...e in place and operating correctly Checks must be made to ensure that the limit switches are in the required locations to stop the hoist automatically in total safety Never connect the hoist without c...

Страница 10: ...ear or electrical trolley Fig 3 5 7 8 Trolley The trolley range is composed of 3 different models The corso TE range exist in two different models 1ton or 2 ton according to the following table Fig 5...

Страница 11: ...e supporting structure and anchor point is strong enough for the rated load of the hoist If the hoist has to be fitted in a location which is dangerous for the operator the safety precautions laid dow...

Страница 12: ...e prohibited The power supply must be provided via a flexible cable of a suitable size In case of a hoist supplied with an electrical drive trolley the device must be connected to the electrical panel...

Страница 13: ...cy stop button on the control station In the event of operating problems emergency stop is obtained by simply pushing the red button on the control pendant To restart the device the red button must be...

Страница 14: ...tal regulation 4 Measure the 11 links and compare the measurements to Fig 19 5 Examine the load chain The load chain must be replaced if any of the following is found Corroded or cracked links Distort...

Страница 15: ...ushing CAUTION Before operating the hoist check carefully that the new load chain is not twisted and the chain welds are positioned outside the hoist load wheel axle After fitting a new load chain the...

Страница 16: ...ust be replaced Refer to the Brake Disc Replacement Procedure on the next page Brake Disc Replacement 1 Disconnect the power supply from the hoist 2 Put the hoist frame in vertical position in order t...

Страница 17: ...In case of heavy duty service chain must be lubricated more frequently X X X Check if the hoist braking system is in proper working order X X X Check brake disk condition X Check the trolley flange an...

Страница 18: ...18 GB Corrective action Risk evaluation Troubleshooting Inpsection Verification done Reason of inspection Supervisor Date 7 TABLE OF INSPECTION...

Страница 19: ...switch Limit switches inoperative Call an approved service shop Fuse inoperative circuit Change the fuse and check the electrical connections Contacts on transformer or pendant control station fautly...

Страница 20: ...l lowering of load the load slips Brake lining worn Adjust the barkes gap refer to section Oil or grease on the brakes lining Spray the lining with brake cleaner and wipe them off Overload Reduce the...

Страница 21: ...7 4 1 Uwaga 4 1 1 Kontrole wst pne 4 1 2 Pod czenie elektryczne 4 1 3 Procedura pod czania na wci gniku tralift TE 4 1 4 Procedura pod czania na wci gniku tralift TE z w zkiem z nap dem elektrycznym 5...

Страница 22: ...fety Standard For Underhung Cranes and Monorails Je li chodzi o rynek europejski zapoznaj si z Dyrektyw 98 37 Maszyny TWOJE ZADANIA PRZEGL DY I KONSERWACJA 6 Upewnij si e na wci gniku tralift TE znajd...

Страница 23: ...wiednie wymogi bezpiecze stwa a ich jako i monta s na wystarczaj co wysokim poziomie do utworzenia systemu ca kowicie bezpiecznego c Ka da podstawa g rna jest stabilna i ma wytrzyma o odpowiedni do ob...

Страница 24: ...wicie bezpiecznie zatrzyma wci gnik Nigdy nie pod czaj wci gnika bez wcze niejszego sprawdzenia czy instalacja elektryczna jest zgodna z przepisami bezpiecze stwa Nigdy nie ci gnij adunku po pod o u N...

Страница 25: ...pne s dwa r ne modele 1 tonowy lub 2 tonowy zgodnie z nast puj ca tabel rysunek 5 z mo liwymi r nymi pr dko ciami przesuwu 3 z jedn pr dko ci i 2 z dwiema pr dko ciami i 2 r nymi typami monta u podwie...

Страница 26: ...ia obci enia nominalnego wci gnika Je li mocowanie wci gnika ma si odby w miejscu niebezpiecznym dla operatora musz zosta zastosowane rodki bezpiecze stwa przewidziane przepisami prawa pracy aby unikn...

Страница 27: ...s zabronione Zasilanie musi by doprowadzone za pomoc kabla gi tkiego o odpowiednich wymiarach W przypadku wci gnika dostarczonego z w zkiem z nap dem elektrycznym urz dzenie musi zosta pod czone do ta...

Страница 28: ...ostu po naci ni ciu czerwonego przycisku umieszczonego na zwisaj cej skrzynce z przyciskami Aby ponownie uruchomi urz dzenie nale y zwolni czerwony przycisk obracaj c nim zgodnie z kierunkiem strza ki...

Страница 29: ...ogniw i por wnaj te pomiary z podanymi na rysunku 19 5 Zbadaj a cuch do podnoszenia a cuch musi zosta wymieniony w przypadku stwierdzenia jednego z nast puj cych objaw w Ogniwa skorodowane lub przerwa...

Страница 30: ...t skr cony oraz czy spoiny a cucha s skierowane na zewn trz osi ma ego ko a a cuchowego wci gnika Po zainstalowaniu nowego a cucha do podnoszenia amortyzatory wy cznik w kra cowych musz by prawid owo...

Страница 31: ...lanie wci gnika 2 Ustaw ram wci gnika w pozycji pionowej aby zesp hamulca znajdowa si w pozycji poziomej 3 Wyjmij obie p ytki bezpiecze stwa n 24 6 odkr caj c cztery ruby mocuj ce i podk adki nr 24 7...

Страница 32: ...u ytkowania a cuch musi by smarowany cz ciej X X X Sprawd czy uk ad hamowania wci gnika dzia a prawid owo X X X Sprawd stan tarczy hamulca X Sprawd cianki boczne w zka i zu ycie ko a X Sprawd zasilani...

Страница 33: ...PL Dzia ania koryguj ce Ocena zagro e Naprawa Przegl d Kontrola przeprowadzon Pow d przeprowadzenia Osoba dokonuj ca przegl du Data 7 CTABELA PRZEGL DU 33...

Страница 34: ...nku i wyreguluj wy cznik kra cowy Wy czniki kra cowe nie dzia aj Wezwij autoryzowany serwis Bezpiecznik lub obw d nie dzia a Sprawd po czenia elektryczne i wymie bezpiecznik Wadliwe styki na transform...

Страница 35: ...ie adunku lub lizganie si adunku Ok adzina cierna hamulca zu yta Wyreguluj rozstaw hamulc w patrz rozdzia Obecno oleju lub smaru na ok adzinie hamulc w Oczy ok adzin preparatem do czyszczenia hamulc w...

Страница 36: ...1 8 2 2 2 3 8 3 8 41 3 1 3 2 3 3 3 3 1 3 3 2 3 4 4 D J9 9 D9 J9 K 9 41 42 4 1 4 1 1 4 1 2 4 1 3 tralift TE 4 1 4 tralift TE 5 L D J 9D 9 9 9 J D D L 43 5 1 5 2 5 3 6 9 J9 9 D O 9 44 47 6 1 6 2 L 6 3...

Страница 37: ...unning Single Girder Cranes ANSI ASME B30 2 Safety Standard For Top Running Double Girder Cranes ANSI ASME B30 11 Safety Standard For Underhung Cranes and Monorails 9 98 37 4 4 A D 4 6 tralift TE 7 9...

Страница 38: ...38 RU 13 tralift TE 14 4 D F F G F 4 TRALIFT TE tralift TE D D J 9 9 D a b d e f 4 F 4 Q G I 4 I 9 tralift TE Tralift D 4 F 4 G G G I 4Q 4 F 4 4 G A G...

Страница 39: ...39 RU 1 9 Electrical Chain Hoist ECHWT Electrical Chain Hoist with Trolley H 9 9 8 L 9 L 2...

Страница 40: ...G 4 G 4 1 1 230 400 50 8 3 9 230 460 60 8 3 m 9 9 9 9 1 2 1 2 1 3 tralift TE 4 tralift TE m 48 80 2 G A 2 1 8 tralift TE 3 125 2 3 5 7 8 3 corso TE 1 2 5 3 2 2 corso 1 2 corso 1 2 1 1000 2 1200 2 2 tr...

Страница 41: ...so TE corso corso 2 3 8 D 3 G 4 4 3 1 m 5 PZ1 X 100 3 5 x 100 F D 3 2 9 16 17 20 1 2 3 4 44 1 8 20 5 L 6 L 3 3 9 14 15 8 9 3 3 1 9 3 3 2 21 1 3 22 2 W 3 Y T W 4 Z Y 5 Y Y 6 W 1 2 9 3 4 26 4 G D D I 4...

Страница 42: ...42 RU G G H 20 230 400 460 9 4 1 2 51 86 5 11 9 12 4 1 3 tralift TE 1 2 3 4 5 6 L 4 1 4 tralift TE 1 2 3 4 5 6 7 8 L G G 11 12 G G G G G G 20...

Страница 43: ...43 RU 5 F D 4 G D F 4 SAE 120 27 13 F 2 13 5 1 G G 8 9 J 8 5 2 L tralift TE 5 3 tralift TE...

Страница 44: ...6 D 4 F D TRACTEL L TRACTEL TRACTEL 6 1 tralift TE 80 G G A 1 2 11 19 3 4 11 19 5 100 C 9 SAE 120 F D L TRACTEL G D I G I A 1 2 d4 d5 22 3 dm d5 4 22 G G A 6 2 L G G TRACTEL TRACTEL TRACTEL G G F TRA...

Страница 45: ...45 RU 1 100 2 3 F D 4 5 G G 6 F D 7 L 27 8 9 10 L 11 2 2 6 3 tralift TE 1 2 3 4 a m 10 A 23 ANSI B30 10 EN1677 9 23 TRACTEL b 23 6 4 G G TRACTEL...

Страница 46: ...0 5 N 2 N 1 9 2 1 N 2 N 1 9 1 2 3 N 3 N 4 4 0 5 N 2 N 1 L N 5 5 N 5 1 6 N 5 1 6 6 N 3 N 4 7 F D F 1 2 3 N 24 6 N 24 7 24 8 4 N 24 9 N 24 10 N 24 4 24 5 5 N 24 3 N 24 2 6 7 0 5 1 8 N 24 6 N 24 7 24 8 F...

Страница 47: ...G G 4 F TRACTEL TRACTEL 9 9 X X X X X X X X X X X X X X X X 2 X X X X X X X X X X X X X X X X X X X X X X X X Controllare l usura e la tenuta e o la deformazione del gancio di sospensione X X X X 2 X...

Страница 48: ...48 RU G 7 A 4 G...

Страница 49: ...49 RU 8 F F 9 9 4 G...

Страница 50: ...50 RU 4 G H L H 9 9 J 9 9 4 G G...

Страница 51: ...002 ED0003 ED0004 This drawing remains the exclusive property of TRACTEL S A S Copying transmission or use is forbidden without our autorisation Schemat ten pozostaje wy czn w asno ci TRACTEL S A S Za...

Страница 52: ...ezpieczenie kierunku fazy L RD1 Rectifier Prostownik FR1 Sonde Sonda L FR Temperature transducer Sonda termiczna F6 Phase protector switch Styk zabezpieczenia kierunku fazy SQ1 Upper limit switch Wy c...

Страница 53: ...i ciowa D To convert voltage from 400V to 230V on the voltage conversion board move the plug xp1 from xs2 to xs1 move the plug xp2 from xs6 to xs5 on the phase protector move the switch handle S1 from...

Страница 54: ...54 L1 L2 L3 PE 1 2 3 4 5 6 3 1 2 3 4 5 6 U 0 X3 1 X3 2 X3 PE V W M2 K M 1 K M 2 P1 PE P1 1 P1 2 P1 3 P1 4 P1 5 P1 6 CORSO TE main power circuit Obw d mocy CORSO TE CORSO TE ED 0001 P1 ind 01 03 2004...

Страница 55: ...s4 xp1 xp2 xs5 xs6 WHx3 4P T4 T5 T6 WHx3 4P T1 T2 T3 230V 400V 4 5 6 30 GN 29 GN 30 GN 29 GN T3 T2 T1 L1 L2 L3 220V 220V 13 14 13 14 13 14 T1 T4 T2 T5 T6 T3 4P 48V 0V 0V 230V 400V 1 X1 3 X1 2 X1 1 2 3...

Страница 56: ...ORSO TE 1 2 3 4 6 7 A1 A2 A1 A2 A1 A2 A1 A2 A1 A2 X1 F6 FR X1 S0 X1 4 X1 5 1 2 3 K2 xs7 1 S2 4 3 4 6 3 4 7 3 4 S3 K3 9 X1 3 K1 X3 4 X3 S4 5 X3 6 X3 10 X1 KM1 S5 KM2 P2 1 P2 2 P2 3 P2 4 xs7 6 P2 6 P2 7...

Страница 57: ...57 PE PE PE P1 6 P1 5 P1 4 P1 3 P1 2 P1 1 K M 1 KM2 A B Main power wiring diagram Schemat okablowania zasilania ED 0001 P4 ind 01 03 2004...

Страница 58: ...58 PE P2 1 P2 3 P2 2 P2 10 P2 8 P2 4 P2 5 P2 6 P2 7 P2 9 KM1 KM2 A Control 48 V wiring diagram with no limit switch Schemat okablowania sterowania bez wy cznika kra cowego ED 0001 P5 ind 01 03 2004...

Страница 59: ...9 PE PE PE P2 1 P2 9 P2 7 P2 6 P2 5 P2 4 P2 8 P2 10 P2 2 P2 3 KM1 KM2 A B C Control 48V wiring diagram with limit switch Schemat okablowania sterowania z wy cznikiem kra cowym ED 0001 P6 ind 02 03 200...

Страница 60: ...000kg 2 ci gna 12 biegun w 11 6 4 bieguny 4 945 tralift TE 250 1 500 2 12 46 14 4 21 27 500 1 1000 2 12 22 55 4 9 162 1000 1 2000 2 12 11 6 4 4 945 D To convert voltage from 400V to 230V on the voltag...

Страница 61: ...61 L1 L2 L3 PE 1 2 3 4 5 6 3 1 2 3 4 5 6 0 X3 1 X3 PE 2 KM1 U V W M2 X3 KM2 P1 4 P1 3 P1 2 P1 PE P1 1 P1 5 P1 6 CORSO TE main power circuit Obw d mocy CORSO TE CORSO TE ED 0002 P1 ind 01 03 2004...

Страница 62: ...GN 29 GN BKx3 12P T4 T5 T6 WHx3 4P T4 T5 T6 WHx3 4P T1 T2 T3 BKx3 12P T1 T2 T3 37 YL 28 WH 50 BK 21 YL 24 BK 23 RD 44 YL 45 RD 43 BR 46 RD L1 L2 L3 220V 220V 13 14 13 14 13 14 T1 T4 T2 T5 T6 T3 T1 T4...

Страница 63: ...CORSO TE 4 5 A1 A2 A1 A2 3 4 A1 A2 21 22 A1 A2 3 4 A1 A2 A1 A2 A1 A2 4 X1 5 X1 6 X1 7 X1 8 9 X1 4 X1 5 10 6 K4 K1 X1 3 S0 FR KM1 4 S5 X3 X3 X3 X3 K2 S2 1 2 3 4 K3 3 S3 4 K4 K5 F6 3 4 S4 KM2 xs7 1 P2 1...

Страница 64: ...PE PE P1 6 P1 5 P1 4 P1 3 P1 2 P1 1 PE KM 1 KM2 A B 64 Main power wiring diagram Schemat okablowania zasilania ED 0002 P4 ind 01 03 2004...

Страница 65: ...P2 7 P2 6 PE P2 1 P2 9 P2 5 P2 4 P2 3 P2 2 P2 10 P2 8 K M 1 KM2 A 65 Control 48 V wiring diagram with no limit switch Schemat okablowania sterowania bez wy cznika kra cowego ED 0002 P5 ind 01 03 2004...

Страница 66: ...6 PE PE PE P2 1 P2 9 P2 7 P2 6 P2 5 P2 4 P2 8 P2 10 P2 2 P2 3 KM1 KM2 A B C Control 48V wiring diagram with limit switch Schemat okablowania sterowania z wy cznikiem kra cowym ED 0002 P6 ind 02 03 200...

Страница 67: ...oard P ytka zaciskowa dwunapi ciowa D To convert voltage from 400V to 230V on the voltage conversion board move the plug xp1 from xs2 to xs1 move the plug xp2 from xs6 to xs5 on the phase protector mo...

Страница 68: ...2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 0 X3 1 X3 2 X3 PE V2 W1 W2 M2 KM2 KM3 KM1 U1 U2 V1 KM4 P1 1 P1 2 P1 3 P1 PE P1 4 P1 5 P1 6 CORSO TE main power circuit Obw d mocy CORSO TE CORSO TE ED 000...

Страница 69: ...2 6 4 2 5 3 1 T1 T2 T3 230V 400V xs1 1 2 3 4 5 6 7 8 9 xs2 xs3 xs4 xp1 xp2 xs5 xs6 230V 400V 4 5 6 L1 L2 L3 220V 220V 13 14 13 14 13 14 T1 T4 T2 T5 T6 T3 4P 48V 0V 0V 230V 400V 1 X1 3 X1 2 X1 1 S1 2 K...

Страница 70: ...3 4 6 7 8 A1 A2 A1 A2 A1 A2 A1 A2 A1 A2 3 4 A1 A2 21 22 3 4 A1 A2 X1 X3 S0 K2 FR KM1 KM2 S2 4 KM4 5 X1 S3 1 2 3 4 9 X1 3 4 K3 F6 9 6 3 4 K1 X1 S4 7 X1 10 3 4 S5 KM3 KM4 X1 3 X3 4 X3 5 X3 6 X3 xs7 1 P2...

Страница 71: ...71 PE PE PE P1 6 P1 5 P1 4 P1 3 P1 2 P1 1 KM1 KM2 KM3 KM4 A B Main power wiring diagram Schemat okablowania zasilania ED 0003 P4 ind 02 07 2004...

Страница 72: ...PE P2 8 P2 1 P2 9 P2 10 P2 7 P2 6 P2 5 P2 4 P2 2 P2 3 KM1 KM2 KM3 KM4 A Control 48 V wiring diagram with no limit switch Schemat okablowania sterowania bez wy cznika kra cowego ED 0003 P5 ind 02 07 20...

Страница 73: ...PE PE P2 10 P2 8 P2 1 P2 9 P2 7 P2 6 P2 5 P2 4 P2 2 P2 3 KM1 KM2 KM3 KM4 A B C Control 48V wiring diagram with limit switch Schemat okablowania sterowania z wy cznikiem kra cowym ED 0003 P6 ind 03 03...

Страница 74: ...o 2000kg 2 ci gna 12 biegun w 11 6 4 bieguny 4 945 tralift TE 250 1 500 2 12 46 14 4 21 27 500 1 1000 2 12 22 55 4 9 162 1000 1 2000 2 12 11 6 4 4 945 D To convert voltage from 400V to 230V on the vol...

Страница 75: ...2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 1 2 3 4 5 6 X3 U1 U2 V1 V2 W1 W2 M2 PE 2 X3 1 X3 0 KM1 KM3 KM4 KM2 P1 3 P1 2 P1 1 P1 6 P1 5 P1 4 P1 PE CORSO TE main power circuit Obw d mocy CORSO TE CORSO TE ED 000...

Страница 76: ...D 34 GN 41 BR 41 BR 39 GR 40 GR 48 RD 47 RD 43 BR 45 RD BKx3 12P T4 T5 T6 WHx3 4P T4 T5 T6 WHx3 4P T1 T2 T3 BKx3 12P T1 T2 T3 44 YL 46 RD L1 L2 L3 220V 220V 13 14 13 14 13 14 T1 T4 T2 T5 T6 T3 T1 T4 T...

Страница 77: ...A2 A1 A2 3 4 A1 A2 3 4 A1 A2 21 22 A1 A2 A1 A2 A1 A2 A1 A2 3 4 21 22 A1 A2 3 4 5 X3 1 S0 2 X3 6 S2 3 FR KM1 KM2 4 4 K2 X1 3 KM4 4 KM3 KM4 K3 5 S3 K4 X1 K5 K4 F6 6 X1 K1 X1 X3 S4 X3 7 X1 S5 10 4 3 8 X...

Страница 78: ...78 PE PE PE P1 1 P1 2 P1 3 P1 4 P1 5 P1 6 KM1 KM2 KM3 KM4 A B Main power wiring diagram Schemat okablowania zasilania ED 0004 P4 ind 02 03 2005...

Страница 79: ...PE P2 3 P2 2 P2 4 P2 10 P2 5 P2 6 P2 7 P2 9 P2 1 P2 8 KM1 KM2 KM3 KM4 A Control 48 V wiring diagram with no limit switch Schemat okablowania sterowania bez wy cznika kra cowego ED 0004 P5 ind 02 07 20...

Страница 80: ...PE PE P2 10 P2 3 P2 2 P2 4 P2 5 P2 6 P2 7 P2 9 P2 1 P2 8 KM1 KM2 KM3 KM4 A B C Control 48 V wiring diagram with limit switch Schemat okablowania sterowania z wy cznikiem kra cowym ED 0004 P6 ind 03 03...

Страница 81: ...gno 1000kg 2 ci gna 6 9 1000 kg 1 ci gno 2000 kg 2 ci gna 3 6 125 1 20 8 250 1 500 2 15 4 500 1 1000 2 6 9 1000 1 2000 2 3 6 C Voltage conversion board P ytka zaciskowa dwunapi ciowa D To convert volt...

Страница 82: ...GR 47 RD 1 3 5 2 4 6 5 3 1 6 4 2 6 4 2 5 3 1 T1 T2 T3 230V 400V xs1 1 2 3 4 5 6 7 8 9 xs2 xs3 xs4 xp1 xp2 xs5 xs6 230V 400V X3 X4 L1 L2 L3 PE L1 L2 L3 220V 220V 13 14 13 14 13 14 T1 T4 T2 T5 T6 T3 4P...

Страница 83: ...5 GR 9 RD 51 BK 50 BK 20 BK SQ 2 19 BK 10 GR 18 BK 4 RD 7 RD 1 2 3 4 A1 A2 A1 A2 A1 A2 6 1 2 3 4 5 9 3 4 4 X1 S1 S2 K2 xs7 2 X1 X1 S3 xs7 3 K3 X1 F6 FR K1 7 X1 xs7 4 10 X1 xs7 6 xs7 1 A Control 48 V c...

Страница 84: ...t TE 250kg 1 ci gno 500kg 2 ci gna 12 biegun w 46 14 4 bieguny 21 27 500kg 1 ci gno 1000kg 2 ci gna 12 biegun w 22 55 4 bieguny 9 162 1000kg 1 ci gno 2000kg 2 ci gna 12 biegun w 11 6 4 bieguny 4 945 t...

Страница 85: ...BR 30 GN 1 3 5 2 4 6 5 3 1 6 4 2 6 4 2 5 3 1 T1 T2 T3 230V 400V xs1 1 2 3 4 5 6 7 8 9 xs2 xs3 xs4 xp1 xp2 xs5 xs6 230V 400V 1 3 5 2 4 6 2 4 6 1 3 5 xp3 T1 T2 T3 X4 X2 L1 L2 L3 PE L1 L2 L3 220V 220V 1...

Страница 86: ...GR 15 GR 51 BK 50 BK 20 BK 9 RD 4 RD 8 RD 7 RD 3 2 5 4 A1 A2 A1 A2 3 4 A1 A2 21 22 A1 A2 3 4 A1 A2 4 X1 5 X1 6 X1 7 X1 8 9 X1 X1 10 K4 K1 X1 S0 FR K2 S2 1 2 3 4 K3 3 S3 4 K4 K5 F6 xs7 1 xs7 2 xs7 3 xs...

Страница 87: ...erwaltungsrates President Directeur Presidente Administrerende direkt r Toimitusjohtaja President og Generaldirekt r Vd och styrelseordf rande Prezes 8 Eln k vez rigazgat Gener ln editel 8 Presedinte...

Страница 88: ...VERKLAART DAT De in hieronder beschreven uitrusting conform de technische veiligheids voorschriften is die van toepassing zijn op de datum van de marktintroductie in de EUROPESE UNIE door de fabrikan...

Страница 89: ...89 NAME and Surname Nazwisko i imi Date Data Signature Podpis...

Страница 90: ...90 NAME and Surname Nazwisko i imi Date Data Signature Podpis...

Страница 91: ...91 NAME and Surname Nazwisko i imi Date Data Signature Podpis...

Страница 92: ...9 800 Fax 351 214 459 809 TRACTEL POLSKA Sp Zo o ul Byslawska 82 04 993 Warszawa T 22 61642 44 Fax 22 616 42 47 PL PT LU BE DK NL IT ES GB DE LU FR TRACTEL LTD 1615 Warden Avenue Scarborough Ontario M...

Отзывы: