5.9.2. Wire guide relative position setting
This correction shifts zero coordinate of the wire guide (relative zero position). It allows you to correct
the wire gu
i
de position to be in accordance with the bobbin or winding tool.
Default: 5 mm
rel. pos. 9mm
rel. pos. 5mm
rel. pos. 1mm
the same wire guide coordinate depending on relative position
relative zero
0 0 0
Holding any of the buttons pressed (cca 0,5 s) moves the wire guide continuously.
1
2
17 / ERN T / V 1.3
Содержание ERN 100T
Страница 8: ...5 ERN T V 1 3 UPS POWER MAN I 0 TOTAL STOP BRAKE 8 9 10 11 12...
Страница 36: ...Type of cycle 33 ERN T V 1 3 1 2 7 2 5 Delay Time of delay PROGRAM PROGRAM PROGRAM 2 1 3...
Страница 50: ...48 ERN T V 1 3 Delay 1 2...
Страница 53: ...51 ERN T V 1 3 Copy step 1 2 Pressing of button COPY STEP ends copying...
Страница 54: ...52 ERN T V 1 3 Delete step 1 2...
Страница 56: ...54 ERN T V 1 3...
Страница 58: ...56 ERN T V 1 3 9 3 Programme copy This function allows to copy programmes already created 1 2 1 2...
Страница 61: ...10 3 Model selection 10 4 Display language 59 ERN T V 1 3 Allows a selection of display language 1 2 3 1 2...