42
GB
Step 9: Hang the indoor unit
1.
Put the bound pipes in the wall pipe
and then make them pass through
the wall hole.
2.
Hang the indoor unit on the wall-
mounting frame.
3.
Stuff the gap between pipes and
wall hole with sealing gum.
4. Fix the wall pipe.
5.
Check if the indoor unit is installed
fi
rmly and closed to the wall.
NOTE
Do not bend the drain hose too
excessively in order to prevent blocking.
Con
fi
guration of connection pipe
1. Standard length of connection pipe: 5m, 7.5m,8m.
2.
Min. length of connection pipe.
For the unit with standard connection pipe of 5m, there is no limitation for
the min length of connection pipe. For the unit with standard connection
pipe of 7.5m and 8m, the min length of connection pipe is 3m.
3. Max. length of connection pipe is shown as below.
Max. length of connection pipe
Cooling capacity
Max. length of
connection pipe(m)
5000Btu/h (1465W)
15
7000Btu/h (2051W)
15
9000Btu/h (2637W)
15
12000Btu/h (3516W)
20
18000Btu/h (5274W)
25
24000Btu/h (7032W)
25
28000Btu/h (8204W)
30
indoor
wall pipe
sealing gum
upper hook
lower hook of
wall-mounting frame
outdoor
Содержание CTG-228BRM
Страница 122: ...GR 122 Σημειώσεις Notes ...
Страница 123: ...123 GR 123 Σημειώσεις Notes ...