7. Route the communication cable as required to the wall control electrical box.
8. Attach the communication cable to the wall control. (Fig. #18)
9. Insert the 4 supplied “AA” batteries into the battery pack and connect to wall control.
(Fig. #19)
10. Fasten the wall control into the electrical box.
11. Fasten the coverplate to control.
12. If not already installed, install the burner using the instructions supplied
with the burner kit.
13. Turn on electrical supply.
15. Press the up button (Fig.21) on the wall
control and hold it for 5 seconds or
until a clicking sound is heard from the
gas control. Release the button, check
manifold pressure and ensure that it’s
correct.
(Refer to Burner installation manual)
16. Press the center button of the wall control.
The fireplace will shut off.
17. Install the remaining screws in the access
panel and tighten.
18. Remove the pressure gauge and the
extension test fitting and thread the plug
into the pressure test port. Thread seal-
ant is required on the threads. (Refer to
Burner installation manual)
19. Turn the fireplace on.
Standing Pilot Function
(Only for use where permitted)
The control system on this fireplace is set to operate as electronic ignition. If required the
system can be converted to a standing pilot by depressing a recessed button located on the
lower right hand side of the wall control. (Fig. #22) This should be depressed with a paperclip,
pencil or other thin object. Once activated the pilot will run continuously. Please check with
your local inspector to ensure that this is permitted in your area.
14. Press the center button on the wall control (Fig. #20). The igniter will start to spark.
After a short delay the pilot will light, followed by the main burner.
Fig. #18
Fig. #19
Fig. #20
Fig. #21
Fig. #22
LEARN BUTTON
STANDING PILOT BUTTON
NOTE: Proceed to Gas Supply/Connections section and follow steps there
before continuing.
14
TCWS.38CE3 250313-44