•  if the SYNC-function is needed when connect

-

ing 

two

 photocells LS26 

(see notes for photo­

cells)

, then 

the infrared frequency of both  

transmitter-/receiver pairs the Jumper J 

have to be adjusted  in a different way.

Photocells

• 

The control unit has a power supply connection for a  24V a.c. photocell (LS):

  supply LS-transmitter: terminals 41/42  Note:  in  „closed“  position  the  terminals  41/42  are  being  switched

 

 

into energy saving mode (no current)

  supply LS-receiver: terminals 43/44. 
•  The  contact  has  to  be  closed  when  using  powered  and  positioned  photocells  (opening  contact).

 

Connection of the photocell contact: terminals 45/46 

• 

When using two pairs of photocells please do not install 

both photocell transmitters/receivers on the same side (to 

eleminate interference between both)

 !

 

Exception:

  photocells  with 

SYNC function 

allow  the 

installation  of  both  photocell  transmitters/receivers  on 

the same side without causing interference to each other. 

 

Therefor the photocells LS25, LS31, LS40 

are supplied 

with  necessary  a.c.  voltage  by  this  control. The  SYNC 

function of LS26 works with adjustment of different infrared 

frequencies

•  Photocell self-test function: 

 

The control board is equipped with a self-test function for the connected photocell. With an opening impulse (switch or 

button) the transmitter of the photocell is switched off for a short time in barrier position „closed“ . Thus the photocell 

receiver interrupts the contact 45/46  - so the control board verifies the function of the photocell receiver. If this short 

interruption at the photocell input is not carried out, the control board reports an error. 

The deactivation of the self-test 

function is only allowed if the safety installations correspond to the category 3 !  

•  The exact function of the photocells depend on the programming of the control unit.

 

Photocell function please see 

menu point SAFETY / photocell function or photocell with pause time (p. 18)

•  You will find d

etailed information in the corresponding photocell manual.

Safety

 

Connections and adjustments ST 80(V)A

 

G

 Photocell 

(Contact: terminals 45/46)

 

Safety

 

active: 

to be selected, if photocell should be triggered. 

 

not active:  

to be selected, if photocell should 

not

 be triggered.

Standard:

transmitter1 receiver1

receiver2 transmitter2

with SYNC-function:

transmitter1 receiver1

transmitter2 receiver2

Photocell - connection examples

 

Photocell Tousek LS 26  

 

as safety device

+~

-~

12/24V

J

+~

-~

12/24V

NC C NO

J

transmitter receiver

41

42

43

44

45

46

ST 80(V)A

Содержание ST 80A

Страница 1: ...Installation and connection manual Barrier control unit ST 80A ST 80VA in combination with traffic light control STA 11...

Страница 2: ...terminals 45 46 16 Photocells connection examples 16 17 G Main closing edge terminals 50 52 18 PHC ISD function 18 PHC ISD pause time 18 PHC test 18 Motor 19 max force 19 ARS response time 19 Speed OP...

Страница 3: ...on and operating instructions The TOUSEK Ges m b H rejects any liability if the product is used in any way not fully conforming to its original purpose as stated herein Children have to be instructed...

Страница 4: ...l radio receivers and induction loop detector Operator control board ST 80 V A Traffic light control board STA 11 General For the implementation of the traffic light system the traffic light control b...

Страница 5: ...ED 2 opening command INSIDE or OUTSIDE RED RED Prewarning OPEN is being started red traffic light warning and possibly signal light warning before opening the door gate duration adjustable via gate au...

Страница 6: ...mand FE Slot for optional radio receiver p 8 F fuse 3 15A T Warning Before opening the control board box please switch off necessarily the main switch In supplied control inside the unit is powered th...

Страница 7: ...rator control board see operator control board 97 6 99 6 96 6 98 6 GREEN outside RED outside GREEN inside RED inside Traffic light outputs outside GREEN term 97 6 RED term 99 6 inside GREEN term 96 6...

Страница 8: ...raffic light control board STA 11 Important With the use of the 2 channel receiver the first chan nel takes over the function for the impulse switch outside and the second channel the function for the...

Страница 9: ...tousek EN_ST 80A_04 25 03 2020 9...

Страница 10: ...op fu Without function in connection with traffic light control board ZM Slot for optional module Status display p 24 T Transformer F1 safety fuse F 5A F2 safety fuse F 2A 3 Barrier control board ST 8...

Страница 11: ...e turned off If the control is power supplied its inner part is under tension In order to avoid electrical strokes the safety regulations have to be respected The device may only be connected by train...

Страница 12: ...value of a parameter is given When pressing the button you return to the superior menu point Possibly changed adjustments of a parameter are rejected with this button the former values will remain AU...

Страница 13: ...g only with ST 80VA active not active lights lamps see page 20 prewarning OPEN OFF 1 30s OFF Green phase 5 120s increment 1 20s Clearance time 1 60s increment 1 5s Traffic light gate CLOSED OFF consta...

Страница 14: ...o be kept The device may only be connected by trained profes sionals Theproductisnotsuitableforinstallationinexplosion hazardous areas Anall poledisconnectingmainsswitchwithacontact opening gap of min...

Страница 15: ...unction of I loops has to be selected under ISD channel 1 and ISD channel 2 I loops can be connected onto the traffic light control board STA 11 as command transmitters For this the STA 11 has also to...

Страница 16: ...uencies Photocell self test function The control board is equipped with a self test function for the connected photocell With an opening impulse switch or button the transmitter of the photocell is sw...

Страница 17: ...upport SYNC function the photocell transmitters and receivers have to be mounted on different sides 2 Photocells Tousek LS 45 2 as safety device Photocells Tousek RLS 620 as safety device 24Va c 12 24...

Страница 18: ...uption of the photocell induction loop during closing makes the barrier reverse open In automatic mode the barrier closes as soon as the pause time has run out In impulse operation another closing com...

Страница 19: ...able increment 5 determines the max possible motor force ARS response time 0 5s factory setting Motor 0 15 0 95s closing speed adjustable increment 0 05 determines in which time the AR System responds...

Страница 20: ...0 11 Light Lamps turned off 1 30s adjustable Before each opening movement the signal lamp flashing light is activated for the adjusted time Boom lamp CLOSE terminals 70 71 Light Lamps The boom lamp bl...

Страница 21: ...y of the optional module in control unit ST 80 V A p 24 Max contact load 1A 24Va c d c Signal contacts Description status display module see page 24 Peripherals Status display 1 with the two potential...

Страница 22: ...ES reset back to factory settings and delete the adjusted limits The end posistions limits will be redetermined after impulse Software version control function Reset Diagnosis shows the software versi...

Страница 23: ...perator control board ST 80 V A the I loop function depends on the settings under buttons switches ISD channel 1 2 safety PHC ISD function and safety PHC ISD pause time Detailed informations can be fo...

Страница 24: ...under Peripherals Signal contacts p 21 Connection the module Turn off the power supply Plug in the status display module into the slot ZM With the potential free signal contacts K1 term 90 91 and K2 t...

Страница 25: ...ell active Main safety edge active Photocell not active Main safety edge not active change YES confirm change YES confirm BASIC SETTINGS For setting the most important adjustments for initial operatio...

Страница 26: ...bstacle or is too hard to move check adjustment of forces remove obstacle hence check if boom is easy to move Display photocell test negative interruption or hot wired photocell check correct connecti...

Страница 27: ...ek EN_ST 80A_04 25 03 2020 27 Dimensions in mm We reserve the right to change dimensions and technical specifications without prior notice 240 195 Depth 105 8 Dimensioned drawing of housing IP54 ST 80...

Страница 28: ...Gliwicka 67 Tel 48 32 738 53 65 Fax 48 32 738 53 66 info tousek pl Tousek s r o Czech Republic CZ 252 61 Jene u Prahy Pr myslov 499 Tel 420 777 751 730 info tousek cz We reserve the right to change d...

Отзывы: