Before Use
(after trims are installed)
HOT
COLD
Handle
KNOB
Volume
Control
Handle
about 104°F
Confirm the temperature of the water output.
1)
Set the temperature control handle in the Mark at
“
104
” an
d confirm that output temperature is
104°F.
2) If temperature output is not 104°F, following adjustment
should be done.
To prevent scalding, the recommended hot water
temperature is
140°F (60°).
Confirming the outlet temperature and calibrating the valve
is required to minimize the risks of scalding.
After calibrated, the outlet temperature must read
104°F
while
the temperature control handle knob is in the middle.
4) Installation of the Valve
(the Finished Wall)
Lower LImit
Upper LImit
Guard Cover
Finished
Wall
Guard Cover
Guard Cover
Guard
Cover
Guard
Cover
Single Volume
Control Valve
Dual Volume
Control Valve
Handshower
Adapter
Thermostatic Mixing
Valve
1) Fill the installation valve opening with
plumber’s putty or alike.
2) Again,
make sure with the guard cover
provided that distance between Finished
Wall surface and valve falls between MIN
and MAX.
Caution
Leave the guard covers on all the valves till the
tile work is completed.
If the distance is beyond the MIN and MAX
limit, valve trim cannot be mounted
properly.
Must confirm wall, both rough and
finished, thickness and distance to the
valve before installing the valve.
ENGLISH