![Toto RENESSE TSKT Скачать руководство пользователя страница 7](http://html1.mh-extra.com/html/toto/renesse-tskt/renesse-tskt_installation-and-owners-manual_1139640007.webp)
6
2) Installation of the Valve
(Water Supply Lines)
3) Before installation,
dirt and debris in the Hot and Cold water supply lines
must be washed out entirely.
4) Connect the Hot and Cold Water Supply Lines.
Union
Thermostatic Mixing
valve
HOT water
supply
COLD water
supply
Elbow
Elbow
Insulating
Material
4-15/16”
(125 mm)
1/2”
NPT
Ԙ
Install cold/hot water supply lines.
ԙ
Connect the union (provided in the package)
to Hot and Cold Water Supply Lines.
Caution
●
●
Attach both unions provided so
that supply lines will be at the
same level.
Wrap the insulating material
around the HOT water Supply
Pipe
GOOD
BAD
Ԛ
Fasten the thermostatic mixing valve with the nuts of unions.
ԛ
After connecting the supply pipes,
do the water test by running the water in
the Shower set and confirm that there is no leakage in all joints.
ENGLISH