www.totalsheds.co.uk
© Sheds (Midlands) Limited 2021
FRONT DOOR PANEL
Attach final Front Panel
(4ft Panel: Single or Double Door)
DID YOU KNOW?
Door panels can be placed
anywhere a 4ft panel is, this
counts for window panels too.
STEP • 8
Page 8
LEFT SIDE PANEL
Now attach Left Side Panel
(4ft wide left blank section)
8a. Place the 4ft left side panel as shown below.
Screw sections together as shown in diagram 8a.
8b. Check that all the frames are correctly fixed and
screwed together from the sides. Use more screws to
strengthen if necessary.
= Drill Points using
screws provided as shown
x3
4.0 x 70mm
Per Panel Edge
Use Red Area as placement guide.
Use Red Area as placement guide.
STEP • 9
9a. Now start back from the Right side placing the 4ft
Door Panel as shown. Fix together with screws to the
right side panel framework as shown in diagram 9a.
DO NOT screw the standing
panels down to the floor just yet.
Leave room for adjustments when the final frame is fitted.
DO NOT screw the standing
panels down to the floor just yet.
Leave room for adjustments when the final frame is fitted.
= Drill Points using
screws provided as shown
x3
4.0 x 70mm
Per Panel Edge
8a.
9a.
DRILL
DRIVER
DRILL
DRIVER